Should Porter expand at Island.

Let Porter expand the airport?

  • Bring on the jets!!

    Votes: 147 75.4%
  • Let's stop this nonsense NOW!

    Votes: 48 24.6%

  • Total voters
    195
I suggest you look at a map, or better yet, an aerial view of Pearson and explain where you think they can expand?

Another east/west runway. 05R/23L.
Taxiway F will continue south to meet M TWY
There was talk of a north deicing facility.
Build pier F on terminal 1. Heck build pier G.
I've seen both on paper. Just build them to add gate capacity.
 
Closing Meigs was a fantastic decision that no one in Chicago regrets. They really improved their city by making some bold decisions like that, look what they have been able do there. So if Pearson it's at capacity, expand it. Don't ruin the rest of the city.

They certainly haven't improved air travel. I use every ounce of seniority I can to bid on flights anywhere BUT Chicago. We call it ABC in my group. Why? No one likes sitting on the ground for 2+ hours, parked, with a plane-loud of unhappy passengers that are whining about connections they're going to miss, all because Chicago lacks the capacity to accommodate the flights that want to get in.

Chicago is a fantastic city. I love visiting there. Flying into it, however, is a goddamned nightmare. As far as aviation goes, closing CGX was a massive blunder.
 
Another east/west runway. 05R/23L.
Taxiway F will continue south to meet M TWY
There was talk of a north deicing facility.
Build pier F on terminal 1. Heck build pier G.
I've seen both on paper. Just build them to add gate capacity.

North Deice won't solve anything. Half the time the runway I'm assigned going into deice is not the runway I end up with when I come up. So if they decided, "Hey, you're going of the north runway, head to North Deice", 50% of the time, I'd have to taxi back south past the other one. Besides, there are two proposed places to put it: the infield terminal, which means demolishing that, which seems a little counter-intuitive to destroy a terminal when you plan on ramping up capacity leading to requiring more parking, or the location where the proposed 05R/23L would be, which means you can't put the runway there.

The talk of 05R/23L sounds good on paper, but on multiple occasions I've been sitting in a huge line to depart the south pair only to be told by ATC they're not using both runways. Enquiries get me no response, my company usually comes back to inform me that it's a staffing issue. So if the GTAA can't manage to staff the 3-runway operation, how in the world are they going to staff a 4-runway op? I suspect it's a matter of build it, then watch it sit there and never get used. Adding gates would be fantastic, but I'm not sure it's feasible. As it stands now, it can suck waiting for a gate after a long flight, but it's not really that common. I suspect they have pretty much exactly how many gates they need for the amount of traffic they have. Unless they can increase capacity, which means adding the extra runways and/or fixing the staffing issues, they probably can't justify more gates.
 
Credit where credit is due. Nav Canada staffing or lack there of would be the staffing reason for a dual rather then triple operation.
 
Well. It's official.

The Terb poll has seen a vote FOR THE PORTER expansion.

At 76%, Terbsters have spoken and demand an expanded Terminal with jets, runways and the whole nine yards.

Lets get the shovels in the ground and get that runway built ;)
 
Credit where credit is due. Nav Canada staffing or lack there of would be the staffing reason for a dual rather then triple operation.

Then NC needs to hire some more staff. They used to be recruiting pretty heavily, but if they're having staffing problems, why'd they close down their center in Cornwall? I thought these guys branched away from the government so they could make better decisions instead of going through public officials. Seems to me if you can't staff your busiest site, you probably shouldn't be shutting down your school. Mind you, I've also heard that their training is ridiculously long with ridiculously high wash-out rates. Perhaps things were better for the industry when they were still government, even if it did mean controllers made less.
 
Well. It's official.

The Terb poll has seen a vote FOR THE PORTER expansion.

At 76%, Terbsters have spoken and demand an expanded Terminal with jets, runways and the whole nine yards.

Lets get the shovels in the ground and get that runway built ;)
Yeah why wait for facts about the jets, about the runways they'll need or about the lake fill required. Just madly dig something somewhere for no reason.

Just BTW, are you the same fmahovalich who told us Rob Ford was gonna be Toronto's greatest Mayor ever, the morning after the election?

Less haste, more thought. The Bombardier jets aren't even being flight tested yet and the world isn't scheduled to end because PorterPeople are still taking prop planes on their missions to boost the economy of Toronto. We can afford to make our decisions wisely, after we get facts. And we have none—zero!—at present. Besides, in a negociating situation, isn't it usually best to appear cautious and encourage the other side to sweeten their offer, rather than flinging yourself down with you pants around your ankles, waggling your shiny ass in the air and hoping.

If you haven't noticed, it's Porter and their patsies doing the begging, even if you make it sound like we are.
 
I suggest you look at a map, or better yet, an aerial view of Pearson and explain where you think they can expand?

Expropriate all the land south of Derry between the airport and the 403. Sooner or later we have to anyway, the island will never grow to meet the demands and if Pearson is at capacity we either need to build that Pickering airport or extend Pearson. Turn Tomken and Dixie into additional runways.

In the end there are economies of scale in having a bigger airport than in having additional airports.
 
I travel with PORTER at least once a month and I personally love it!
On the other hand If I lived close by I would not be alright with PORTER expansion or closing.
I would say keep it the way it is. Right now there is a balance. More then I'd like to acknowledge, humans mess the balance of everything frequently

eros-toronto-lyra-hamilton-the-ultimate-fo1.jpg
 
Expropriate all the land south of Derry between the airport and the 403. Sooner or later we have to anyway, the island will never grow to meet the demands and if Pearson is at capacity we either need to build that Pickering airport or extend Pearson. Turn Tomken and Dixie into additional runways.

In the end there are economies of scale in having a bigger airport than in having additional airports.

The dominant winds are east-west. How does making Dixie into a runway help? Are you realizing how little you understand about aviation yet?
 
Yeah why wait for facts about the jets, about the runways they'll need or about the lake fill required. Just madly dig something somewhere for no reason.

Just BTW, are you the same fmahovalich who told us Rob Ford was gonna be Toronto's greatest Mayor ever, the morning after the election?

Less haste, more thought. The Bombardier jets aren't even being flight tested yet and the world isn't scheduled to end because PorterPeople are still taking prop planes on their missions to boost the economy of Toronto. We can afford to make our decisions wisely, after we get facts. And we have none—zero!—at present. Besides, in a negociating situation, isn't it usually best to appear cautious and encourage the other side to sweeten their offer, rather than flinging yourself down with you pants around your ankles, waggling your shiny ass in the air and hoping.

If you haven't noticed, it's Porter and their patsies doing the begging, even if you make it sound like we are.

The jets absolutely are being tested. The latest announcement from Bombardier is that there was a delay due to certification. They aren't certified on computer models, they're certified on flight test data. 16 September of last year was when flight testing began.
 
Well. It's official.

The Terb poll has seen a vote FOR THE PORTER expansion.

At 76%, Terbsters have spoken and demand an expanded Terminal with jets, runways and the whole nine yards.

Lets get the shovels in the ground and get that runway built ;)

But fuji says no.


Besides, I think the expansion needs to be longer than 9 yards ;)
 
It was a tiny quaint airport, but now is trying to dominate the waterfront. It needs to stay small, afterall, the train to Pearson will be up and running before this matter is even decided upon.

Actually, it's the other way around.

Flights per year:

1967 - 240,000

2012 - 116,267
 
The dominant winds are east-west. How does making Dixie into a runway help? Are you realizing how little you understand about aviation yet?

Those guys who designed Pearson must be real aviation morons for putting in runways parallel to Dixie, but if it makes you happy expropriate land and put in an east/west runway.

It's stupid to recreate all the infrastructure at Pearson at a second location, from maintenance facilities, to passport control, to baggage logistics, it will be cheaper and less intrusive to expand Pearson than build out at Pickering, and no way in hell can the Island grow into a significant second airport.

Saying Pearson is at capacity loses the debate for you, because the island CANNOT remediate that. Ever.
 
Those guys who designed Pearson must be real aviation morons for putting in runways parallel to Dixie, but if it makes you happy expropriate land and put in an east/west runway.

It's stupid to recreate all the infrastructure at Pearson at a second location, from maintenance facilities, to passport control, to baggage logistics, it will be cheaper and less intrusive to expand Pearson than build out at Pickering, and no way in hell can the Island grow into a significant second airport.

Saying Pearson is at capacity loses the debate for you, because the island CANNOT remediate that. Ever.

Being involved in a debate when you constantly show you have no idea how the very business under debate works loses it for you. But let's forget that for now...

The Island isn't trying to expand to accommodate extra airlines. No one is proposing the traffic from Pearson move to YTZ. You, however, are saying Porter should move to YYZ. It is YOUR proposal that they move. How do YOU propose solving the capacity issue to accomodate YOUR solution? Your answer: add another runway parellel to the ones that aren't used. *Golf clap* Or do you think airplanes take off east-west while others are simultaneously taking off north-south? With very few exceptions, the 15/33s are used during periods of strong winds, heavy prepecipitation or emergencies. The only reason they exist, in fact, is because ICAO (an international body that makes oversees civilian aviation) recommends large airports have parallel runways for emergencies. They do not exist because of capacity. And as a pilot, as much as I prefer landing and taking off into wind, they are a nightmare to use. Your new solution? Expropriate land. No problem. Where would you like the 401 moved to? Or where do you want to stick Derry? Of course, you need end-around taxiways as well... so there goes Dixie and Airport Road. Of course, you do know why you need end-around taxiways, right? I mean...you know so much about airports and the aviation biz that you're comfortable talking like an expert. Of course, you also need to start tearing down buildings east and west of the airport that are within the protected areas of the approach path for your new parallel complex too. I'm sure the hotels and condos you bulldoze won't be too upset when you evict them all. Think I'm making it up? Look at the sheer amount of real-estate required for bigger airports. Take Atlanta's proposed expansion for example:

http://www.city-data.com/forum/atta...eld-jackson-atlanta-international-airport.jpg

They're planning to add 1 runway, and look at how much space that takes up. There's no reason to add 1 more runway nestled in around November (where the GTAA proposes a 05R/23L) because that will add a pittance to capacity - another half dozen flights per hour at most. If you're going to expand and hamstring your ability to handle air traffic due to construction, you add a new runway complex, like ATL is doing and add almost 50% to your current acceptance rate.

Of course, that assumes the land passes feasibility studies. It may need to be dug up and refilled with more suitable materials. I'm sure that won't be expensive either. What's your plan on dealing with the capacity lost during renovations? Where would you like that traffic to go, or do you just want to take money out of the airline's pockets, the airport's pockets and the city's pockets? You could always do what Edmonton did, and just build a YYZ-replacement in the boonies designed to handle double the current capacity and plan on expansion room (that's actually how YYZ came to be initially as well), that would work too.

So tell me, when it's all said and done, how are you going to sell the taxpayers on a multi-billion dollar expansion to YYZ or new airport instead of simply adding longer runways to YTZ to add another half dozen flights a day? This is your proposal afterall - your solution to the debate. And I think we're all very anxious to see how you solve these problems.
 
So tell me, when it's all said and done, how are you going to sell the taxpayers on a multi-billion dollar expansion to YYZ or new airport instead of simply adding longer runways to YTZ to add another half dozen flights a day? This is your proposal afterall - your solution to the debate. And I think we're all very anxious to see how you solve these problems.

If it's as insane as some of fuji's other ideas, we'll all have a good laugh!