Should Porter expand at Island.

Let Porter expand the airport?

  • Bring on the jets!!

    Votes: 147 75.4%
  • Let's stop this nonsense NOW!

    Votes: 48 24.6%

  • Total voters
    195
Isn't there also a tunnel or something planned for the island so you don't gave to take that silly ferry ride?

Train to Pearson should be awesome but I'd rather skip Pearson if I could

Yes, the pedestrian tunnel will be completed this year. The ferry service will remain to transport vehicles, fuel etc.

The train may be a nice alternative to driving to Pearson but I'm with you, if I have a choice, I'm taking Porter. Everything about flying out of there is better.
 
Yes, the pedestrian tunnel will be completed this year. The ferry service will remain to transport vehicles, fuel etc.

The train may be a nice alternative to driving to Pearson but I'm with you, if I have a choice, I'm taking Porter. Everything about flying out of there is better.

The train is a nice alternative to the Island airport, which really COULD be shut down and is not really needed at all anymore. There was a real need for that service when getting to Pearson was a major PITA, but that has been comprehensively solved by the Union Pearson express train.

What is better about flying off the Island is Porter, it is a fantastic airline. It would still be a fantastic airline if it was operating out of Pearson instead of the Island. It is fantastic flying Porter out of EWR or Ottawa or wherever else it flies. The secret sauce there is Porter, not the Island, and the service could be moved to Pearson if we wanted to close the Island airport.
 
No one has given a real answer to either major point:

1. Why not wait a few months for the noise data from the flight tests, and for the assessment on how long the runway really needs to be? What is the point in approving it without that information?

2. Why is this even needed now that we have a fast express train from Union to Pearson?

I believe I did answer your question about noise: it doesn't matter. No modern aircraft of realistic size (ie not an A380) is going to be that loud. The Dash 8's currently being flown by Porter will probably be the loudest thing there. Just because something is a jet doesn't mean it's louder. And, as I also said, people are going to complain anyway because they have a perception of louder noises from things that look loud. But hey, don't take my word for it if you don't want. Just compare newer aircraft, even really big ones, to older ones, like Dash 8's, and see for yourself. Here's a list with noise levels. (http://www.nbaa.org/ops/environment/quiet-flying/AC36-1H.pdf) You'll see very quickly that modern aircraft are extremely quiet relatively speaking, and propellers happen to be loud bastards by nature of how they're made. A modern jet producing more thrust at lower weight with more reliability is quieter than a modern prop. Smaller airlines still fly props because they're cheaper to operate provided you don't need the extra range, but they certainly aren't quiet, especially on landing when the propeller is essentially working as a giant break.

The reason Porter doesn't want to wait is simple... They want to be able to place an order NOW. Do you know how long it takes to get aircraft? You don't walk into a store and say, "Hello Boeing, I would like 10 737's please. Can you deliver them Saturday?" There are waiting lists to get on. If Porter committed tomorrow, they'd already be 15th in line. They'd have to wait for 198 to roll off the assembly line before they could get their first one. Better yet, the 14 ahead of them have options for 152 more, and as firm orderers, would get priority on options as well, so they may need to wait for 350 aircraft to roll off the assembly line. At peak, Bombardier will be able to pump out 12 per month. That means Porter is looking at delivery 30 months after production starts for delivery of their first ones if all options are exercised. And that's if they order now. Other airlines can jump in any time and firm up an order, pushing Porter further and further down the line.

Part 2 I don't have an answer to. As a pilot whose company operates out of Pearson, I'm with you. Everyone go to Pearson! We're a friendly bunch! Or let them lengthen the runway at the Island so I can fly in there too, and then come there! I don't really care, as long as I get to keep flying.
 
I believe I did answer your question about noise: it doesn't matter. No modern aircraft of realistic size (ie not an A380) is going to be that loud. The Dash 8's currently being flown by Porter will probably be the loudest thing there. Just because something is a jet doesn't mean it's louder.

That's what Porter claims. Why not wait for the facts?

As for Porter wanting to place an order NOW, that's nice for Porter, but I don't think the city should be tied to Porter's desire to speed up the delivery of planes that might in fact turn out to be horribly wrong. It sounds like the City should save Porter from a potentially expensive blunder by saying "no" until the facts are in. If Porter goes ahead and places that order, and then it turns out that despite your claims, THOSE particular jets don't meet the VERY stringent noise requirement, or turn out to require a runway that is a lot longer than what Porter expects to build -- well then it will be a big clusterfuck. Better to wait.

Part 2 I don't have an answer to. As a pilot whose company operates out of Pearson, I'm with you. Everyone go to Pearson! We're a friendly bunch! Or let them lengthen the runway at the Island so I can fly in there too, and then come there! I don't really care, as long as I get to keep flying.

Or just close the Island entirely to commuter service and relocate Porter and their fantastic customer service to Pearson.
 
The train is a nice alternative to the Island airport, which really COULD be shut down and is not really needed at all anymore. There was a real need for that service when getting to Pearson was a major PITA, but that has been comprehensively solved by the Union Pearson express train.

What is better about flying off the Island is Porter, it is a fantastic airline. It would still be a fantastic airline if it was operating out of Pearson instead of the Island.

Well, to be truthful, it wouldn't. It wouldn't have it's own lounge unless it paid a premium, so higher ticket prices. It wouldn't have easy access to gates unless it leased its own, which would mean higher ticket prices or more waiting/delays. It also would have to pay higher fees, so higher prices on the tickets. Maintenance is a bigger pain, so they'd pay a premium for that, so higher ticket prices. They'd have to fit in with Pearson's traffic, and Pearson is actually REALLY busy. I'm not saying Pearson can't handle more, just they'd have to ramp up to deal with it. Maybe it would give them an excuse to finally build the 3rd terminal building, extend the de-icing facility, and clean up the taxiway layout. In any case, Porter would not be able to be Porter at YYZ. A lot of it's personality and marketing are based on the fact that it can control every facet of operations at YTZ. They just wouldn't be able to do that at Pearson, and they'd have to jack up their prices to even come close to what they offer at the island.
 
Yes, the pedestrian tunnel will be completed this year. The ferry service will remain to transport vehicles, fuel etc.

The train may be a nice alternative to driving to Pearson but I'm with you, if I have a choice, I'm taking Porter. Everything about flying out of there is better.

I'm pretty sure fuel can't take the tunnel. I know that, at Pearson at least, fuel vehicles need to be driven across the airport and aren't allowed to use the service tunnels for safety reasons.
 
"I like getting a premium lounge for free" does not sound like an argument that should carry any merit at City Council. Pay for your premium lounge.
 
"I like getting a premium lounge for free" does not sound like an argument that should carry any merit at City Council. Pay for your premium lounge.

I never said it was. I was simply countering your argument that it would be just as good out of Pearson. Please don't take my arguments out of context, I quoted you specifically to provide the context of my statement.
 
Sure. The train to Pearson reduces the island airport to a "nice to have" priority rather than a "must have". An "I'd rather" versus an "I need".

As such we need to compare it with other "nice to have" things, like peace and quiet, recreational boating, undisturbed park land.

The island airport is no longer really critical to business travel now that the Union Pearson rail link is solving the problem more effectively and in at a larger scale. The UP link brings in business travelers from Europe and Asia, not only regional. But even regionally, there are more flights from Pearson. And with the automated passport/border controls now online at Pearson, waiting times there are now really low.

It is the better solution and had minimal impact on anything else.

Toronto is still plenty green, I don't think commuter jets landing at the island with have any substantive impact on that. Hell, it's all frozen over half the year anyway.
 
That's what Porter claims. Why not wait for the facts?

As for Porter wanting to place an order NOW, that's nice for Porter, but I don't think the city should be tied to Porter's desire to speed up the delivery of planes that might in fact turn out to be horribly wrong. It sounds like the City should save Porter from a potentially expensive blunder by saying "no" until the facts are in. If Porter goes ahead and places that order, and then it turns out that despite your claims, THOSE particular jets don't meet the VERY stringent noise requirement, or turn out to require a runway that is a lot longer than what Porter expects to build -- well then it will be a big clusterfuck. Better to wait.



Or just close the Island entirely to commuter service and relocate Porter and their fantastic customer service to Pearson.

I wish you'd quit mentioning noise, or visit the link I gave you to learn about it. Noise is not a factor. And you obviously don't understand the industry. You asked, "Why do we need to decide now?" I told you why Porter wants you to decide now. You may not think the expansion and success of a business is relevant, but I assure you that the business, its employees and its shareholders sure do. And if you understand the industry, you understand that getting a timely order in for a new aircraft is a BIG deal. Do you have any idea how much money Eremites has made being the first to get an A380? British Airways is pulling in money even now simply because they remain a hot commodity. A lot of people, a significant number, base travel plans on what plane they get to be in, especially if that plane is new and cutting edge.

You fail to grasp the concept that for Porter, they really need to know as soon as possible. The earlier they know, the more money they stand to make. If your biggest complaint is you don't know how much noise they'll make, then you have no argument at all. Better yet, if that's the biggest complaint you have and you truly believe they can just move to YYZ and be able to provide the exact same service, then you don't only show that you're a little confused about aviation, but that you don't know anything about how the entire industry works and is structured and therefore your opinion is irrelevant.

Why should the city care? Porter pays taxes and brings money into the economy. What's good for Porter is good for the city in a general sense, provided it doesn't cause an unacceptable trade-off. Noise won't. Expansion might. That's for zoning to figure out. How does it affect the harbor, what's the impact on the surrounding environment, etc. None of that stuff will be answered by Transport Canada, that's up to the city to figure out. So the city needs to sit down with the people who run the boats and figure that out. If an expansion is feasible, big thumbs up. That's all that really needs to considered. Everything else is smoke and mirrors.
 
I'm pretty sure fuel can't take the tunnel. I know that, at Pearson at least, fuel vehicles need to be driven across the airport and aren't allowed to use the service tunnels for safety reasons.


Where are the service tunnels for the airport?
 
Where are the service tunnels for the airport?

On the airport. If you pull up a map, look for the 5 de-icing pads (the 5 identical rectangles in the middle near the bottom), just above them you'll see an apron (airplane parking area). There's a road that runs just above that first parking area. If you look closely on a decent map, you'll see it's a tunnel that leads from the middle of the field there to the man terminal apron. I asked a refueller about it once, thought it would be super convenient for those times we get fuel from the Esso at the middle of the field, and he told me no fuel trucks allowed under the tunnels. He distinctly said plural. I only know of one other one, but it's not really on the airport and I don't think fuel trucks use it, so there must be some I haven't seen too.
 
Without knowing the specifics of Porter's/Toronto Harbour Commission's plans, it's hard to say exactly what the environmental degradation will be.

Depending on the type of fill, the controls used to contain it and/or what is churned up, etc., the level of damage could range from significant to catastrophic.

Further, the Harbourfront is still a spawning ground for fish (affected by fill + construction.) The Island is still a major stopover for migratory birds (severely affected by planes - along with being a safety issue for passengers & crew, etc.) Water quality during and post-construction is an issue of concern, particularly in the case of fuel spills, along with other 'waste'. Not only is the lake and Harbourfront a public area, it is still Toronto's source of drinking water.

While I only occasionally agree with fuji, in this case I agree that there is no need to rush construction of an intrusive project on public lands without a full technical review and environmental assessment. There is a reason that there are few, if any, airports in the downtown core of a major metropolitan area on or near fresh water, so if 'we' are to proceed, caution should be in order.


Again..what is the 'Catastrophe'??? Would the fish not move a few feet and still be able to spawn? Especially if they lay the dirt down in a non spawning time period.

I need clarity on the catastrophe!
 
The exclusion zone won't be known until the regulator is given the test flight data, at which point they will mandate minimum safe runway and the exclusion zone. That information is due in 2015. It could be what Porter predicts. It could be more. It will certainly be larger than for turboprops.

The noise limits would wind up in court and may be hard to enforce. Porter can and will argue that it should be allowed to continue operating while disputing the city's measurements, then protesting that the city knew the numbers were fuzzy when it approved the jets. It will claim being grounded is an unreasonable penalty, and it will have a point.

Better for the city to make a clear decision with clear information than assume enforcement later will be easy, possible, cheap, timely, or effective. Enforcement AFTER Porter buys the jets would force Porter into insolvency which is a big step the city probably won't take, Deluce playing high stakes poker, but it is hard imagine city government surviving after intentionally and vindictively bankrupting a big employer.

As for Union Pearson, it will be up and running in a couple of months, before the test data from these new planes is even ready. Probably another reason Porter is pushing this, everyone will realize we don't need Jets once the fast rail link to Pearson is online.

You're talking out your ass. Exclusion zones are entirely dependent on ensuring separation between aircraft and obstructions (ie buildings, other aircraft, boats, vehicles, etc). That depends on 2 factors: the size of the obstruction (which is factored into the exclusion zone - for example, nothing taller than 40 ft within the area, or no aircraft of code c size or larger in a given area) and the wingspan of the aircraft. The wingspan of the CS100 is known and therefore the exclusion zones are known. Even if the wingspan changes by a significant margin, it will not bump the aircraft up into a bigger size code. The CS100 is nowhere near the ends of the spectrum for it's size code. Given its size, the exclusion zone, even with the lengthened runway, does not need to change.

Furthermore, exclusion zones are NOT determined by the regulator (which is not TSB, but TC). Exclusion zones are determined by the airport authority. Part of the Canadian Aviation Regulations dictates that the operator must ensure obstructions are kept clear of the area, not that the regulator will determine the area. The operator gets to decide. A perfect example is that in some airports no one is allowed anywhere near the airport surface without authorization from the operator and possibly air traffic control. At other airports, people are allowed to walk right up to a given distance away from the runway. Transport Canada has recommended a 200 foot runway protected be assigned around all runway surfaces, but they don't regulate it. It's entirely up to the airport operator.

Noise is irrelevant. Stop talking about noise. I don't know how many times I have to say it. Review the document I linked already. Sheesh.

You keep going on about test data and TC. Neither of those have anything to do with what is being asked of the city. At all. Not even a little.
 
The train is a nice alternative to the Island airport, which really COULD be shut down and is not really needed at all anymore. There was a real need for that service when getting to Pearson was a major PITA, but that has been comprehensively solved by the Union Pearson express train.

What is better about flying off the Island is Porter, it is a fantastic airline. It would still be a fantastic airline if it was operating out of Pearson instead of the Island. It is fantastic flying Porter out of EWR or Ottawa or wherever else it flies. The secret sauce there is Porter, not the Island, and the service could be moved to Pearson if we wanted to close the Island airport.

Except Pearson is full. Pearson routinely operates at it's maximum arrival rates. I take off when the arrival before me has barely exited the runway, I land when the departure in front me has barely left the ground. Now tell me, how do you plan to squeeze MORE traffic in there? Do you not recall the mess that Canada had with UAE when Emirates was denied more landing slots at Pearson? The Canadian military had to close a base in Dubai because they were no longer welcome. Do you think they denied the income an A380 brings just for fun? No, they had no more slots to give up. The airport is full. Not just are there no gates and no room at the terminal, there literally isn't arrival and departure slots. Getting Porter in means scaling back somewhere else. Who are you going to take away departures from? Porter isn't part of the Star Alliance, which means it can't park at T1. So...are you going to tell Westjet they need to scale back? What about British Airways? Delta? Caribbean? Who do you take those slots away from the get Porter in? Do you realize international connections would be lost? That's huge money. You want to scrap daily Boeing 777 flights to get Dash-8s and CS100s in. or just 737s and RJs? I'm not saying private business jets can't get in, they certainly can though they can often experience significant delays (I remember hearing ATC tell a business jet it had a 14 hour delay due to flow control - Naturally they cancelled their flight). Porter won't fit. Not without massive expansions at Pearson.

I can name another city that thought it could close a smaller, less-busy, conveniently located airport to divert traffic to it's big money-maker... It was called Meigs Field in Chicago. And now they have flow control all day every day for their two port of entry airports that are left (ORD and MDW). And that flow SUCKS. You can get some serious delays because they just aren't able to get you in. They are full. If only they had another runway... Which they did, on the lakeshore, until they closed it. YTZ is useful, it has a lot of traffic, more than just Porter, and closing it means moving that traffic somewhere else. And with YKZ closing soon, the traffic at YTZ is likely to increase. You can actually look at the traffic numbers. NAVCANADA publishes the movements they do at their towers every year. Just look them up and you'll see that YTZ offers more than just Porter, and that those movements are significant.

YTZ is nowhere near in a position traffic-wise where it should be considering shut-down. Unless something major happens, it should be kept running full-tilt. In fact, encouraging more traffic away from YYZ and into YTZ would even help. I know I for one would welcome my airline having more arrival and departure slots, more gates available (nothing sucks worse than flying halfway around the world on barely any sleep only to have to sit parked for an hour because there aren't any gates available) and less congestion on the frequency so ATC can actually hear me when I call them, and all that can happen if more traffic moves to YTZ. The flip side, of course, is possibly more competition on my airlines shorter routes... Good for the flying public, but cuts into my company's profits and therefore possibly my own potential as well. Nonetheless, the airport can handle it and in some ways, absolutely should.

Close it? Stop smoking the cheap drugs. Expanding it is much smarter.
 
Closing Meigs was a fantastic decision that no one in Chicago regrets. They really improved their city by making some bold decisions like that, look what they have been able do there. So if Pearson it's at capacity, expand it. Don't ruin the rest of the city.
 
Of course!!!

Toronto Islanders have been freeloading for decades. Don't near pay their fair share of taxes.
 
Closing Meigs was a fantastic decision that no one in Chicago regrets. They really improved their city by making some bold decisions like that, look what they have been able do there. So if Pearson it's at capacity, expand it. Don't ruin the rest of the city.

You know how in those politics threads you call out gryfin for his evasive answers relying only on personal opinion when he is faced with facts?