Dream Spa

World's tallest bridge

Ponderling

Lotsa things to think about
Jul 19, 2021
1,629
1,329
113
Mississauga
I hope they have the wind and seismic modelling all figured out.

Becuase those are big risks in a cable suspension bridge.

Particularly if said events happen before the bridge is fully constructed.
 

wpgguy

Well-known member
Jun 9, 2005
1,153
431
83
If that bridge was built in North America it would cost twice as much and taken twice as long
100%, it took 2+ years and$135 million just to build a basic 2 lane overpass over a 4 lane highway on flat level ground close to my place.
 

Ponderling

Lotsa things to think about
Jul 19, 2021
1,629
1,329
113
Mississauga
If you look carefully, you notice they have a lot more gear and supplies parked on the deck than really needs to be.
There to provide dead load so the thing while being build does not move around a lot in a wind.
 
  • Like
Reactions: xix
Toronto Escorts