Since 2012 the project has been operating without a realistic schedule, nobody knows how much it is going to cost in the end (way over budget) and it is doubtful whether it will be ready for the Pan Am Games, which will be a major clusterfuck.
The work started under Miller but problems surfaced in 2012 under Ford. Presumably he was too busy smoking crack to bother doing anything about it.
This is a project being run primarily by city staff so indeed it falls under the Mayor's remit.
http://m.theglobeandmail.com/news/t...-deputy-mayor/article18849031/?service=mobile
And
http://m.theglobeandmail.com/news/t...hind-schedule/article18840369/?service=mobile
Article: "Walls would be built without knowing someone needed to do work behind it, so then they'd have to tear it down, do the work, and rebuild it," said one source, a project veteran with access to high-level progress reports.
The work started under Miller but problems surfaced in 2012 under Ford. Presumably he was too busy smoking crack to bother doing anything about it.
This is a project being run primarily by city staff so indeed it falls under the Mayor's remit.
http://m.theglobeandmail.com/news/t...-deputy-mayor/article18849031/?service=mobile
And
http://m.theglobeandmail.com/news/t...hind-schedule/article18840369/?service=mobile
Article: "Walls would be built without knowing someone needed to do work behind it, so then they'd have to tear it down, do the work, and rebuild it," said one source, a project veteran with access to high-level progress reports.