Union Station renovation horribly mismanaged

fuji

Banned
Jan 31, 2005
79,936
9
0
¯\_(ツ)_/¯
is.gd
Since 2012 the project has been operating without a realistic schedule, nobody knows how much it is going to cost in the end (way over budget) and it is doubtful whether it will be ready for the Pan Am Games, which will be a major clusterfuck.

The work started under Miller but problems surfaced in 2012 under Ford. Presumably he was too busy smoking crack to bother doing anything about it.

This is a project being run primarily by city staff so indeed it falls under the Mayor's remit.

http://m.theglobeandmail.com/news/t...-deputy-mayor/article18849031/?service=mobile

And

http://m.theglobeandmail.com/news/t...hind-schedule/article18840369/?service=mobile

Article: "Walls would be built without knowing someone needed to do work behind it, so then they'd have to tear it down, do the work, and rebuild it," said one source, a project veteran with access to high-level progress reports.
 
This is a total clusterfuck. And guess what, there will be no consequences for anyone for this fuckup and waste of taxpayer money. The city staff will keep their jobs, the contractors will make money and won't be blacklisted and everything will be the same.
 
City councillor Denzil Minnan-Wong, who chairs the public works committee, said he is concerned about the situation.

“This might be a reason why we should be looking at more public-private partnerships. The private sector brings in private sector discipline, where projects are finished on time and on budget.”

The "public" part is often the problem in these public private partnerships.
 
City councillor Denzil Minnan-Wong, who chairs the public works committee, said he is concerned about the situation.

“This might be a reason why we should be looking at more public-private partnerships. The private sector brings in private sector discipline, where projects are finished on time and on budget.”

The "public" part is often the problem in these public private partnerships.

Make me laugh....

The only reason that the City is now saying that they should have used a consulting company to manage the project is so the City could have someone to blame. (And make no mistake, they would blame them.)

Generally speaking, a large municipal infrastructure project will turn out a success or not based on whether or not the Engineers and architects who worked on the detailed drawings and specs really knew their stuff or not. This is the bottom line. The more air tight the design, the less wiggle room you give a General Contractor to bill large extras to the contract.
 
The public part worked for Rob Ford when the problems arose two years ago. What did he do about it?

What, do you mean all the unionized guys he basically can't fire?

I don't blame Miller, Ford, Wong. Any of them for this. City workers and Mandarins issue. And the INABILITY to hold them accountable.
 
The public part worked for Rob Ford when the problems arose two years ago. What did he do about it?


This really is nothing you can lay at the feet of Rob Ford as the Union Station project has been in the works for 10 years. So please, forget that line of discussion. As much as I despise Ford, you can't blame him for this one.
 
This really is nothing you can lay at the feet of Rob Ford as the Union Station project has been in the works for 10 years. So please, forget that line of discussion. As much as I despise Ford, you can't blame him for this one.

The problems with the contract arose on his watch. The lack of a schedule happened on his watch. What did he do about it?

Two years is a long time to know about a serious problem and do nothing.
 
The problems with the contract arose on his watch. The lack of a schedule happened on his watch. What did he do about it?

Two years is a long time to know about a serious problem and do nothing.

What would you have him do?

Cancel the Contract? (Not that he has that power anyway, it would take an act of City council and they would be MAD to do such a thing.)

The Contractor - Carillion would simply sue the City and would win a massive judgement and then the whole thing never gets built. Once you sign a contract like this, you are committed to see it through.

It's really not Ford's fault.

Really, it's not. If it was, I'd be the first one to say it is, but it's not.

The bottom line to me comes down to the design. If the design isn't air tight, and what design ever is, you as an owner are in trouble.
 
You can't give credit or blame leaders for how a major project runs. They're only there representing us, voting if the project is necessary. They may need to sell an idea or nix it if we are unsure.
In this case, we're in the hands of the engineers and planners - and I'm sure glad these aren't elected positions.
 
Make me laugh....

The only reason that the City is now saying that they should have used a consulting company to manage the project is so the City could have someone to blame. (And make no mistake, they would blame them.)

Generally speaking, a large municipal infrastructure project will turn out a success or not based on whether or not the Engineers and architects who worked on the detailed drawings and specs really knew their stuff or not. This is the bottom line. The more air tight the design, the less wiggle room you give a General Contractor to bill large extras to the contract.

"The commuter rail service GO Transit had asked for extra large buttons in its new elevators at Union Station for accessibility reasons. The city agreed, but when the supplier offered a smaller option for a fraction of the price, officials took the opportunity to save money. When GO found out, it demanded to get what was outlined in the contract. After a brief investigation, the city learned the mistake would mean an extra two weeks per elevator. It is unclear how many elevators were affected, but a city consultant wrote on March 27, 2013, that “the additional cost for the remaining seven elevators will be in the order of $32,932.82.”


Sounds like someone in the city was trying to do the right thing to save money, but for the wrong reason. GO's right for demanding what they agreed to in the contract. This is a common problem in the private sector too. I've been part of many projects in my company where some dumb ass PM, BA, etc. wants to make a name for themselves and made a decision to "save money." Unfortunately, saving money went against what was outlined in the contract and caused major delays.
 
I do know they have had 2 watermain breaks on this on York street.

Trying to do the job they are doing AND deal with keeping all the commuters happy has to be a nightmare of logistics.
 
Another hose job from public servants/contractors at the expense of taxpayers. I just read that the Pan Am Games are going to cost us 4 billion dollars. Jesus, when will this stop.
 
why do some people feel the need to politicise this?

Because we elect politicians to manage this for us. When they fuck it up, we have no other throat to choke.

This is city staff fucking up a huge project and costing you and me and the rest of the taxpayers a bunch of money.

The buck stops with the mayor when it comes to the operations of the city.
 
Once you sign a contract like this, you are committed to see it through.

Two years ago the city knew there was a problem and did nothing. It did not force the contractor to produce a valid schedule and it did not intervene to create one. The city itself is acting as the top project manager here in case you missed it.
 
Two years ago the city knew there was a problem and did nothing. It did not force the contractor to produce a valid schedule and it did not intervene to create one. The city itself is acting as the top project manager here in case you missed it.

So I take it the "mismanagement" of the e-Health and Gas plant files has caused you to want heads to role?
 
Two years ago the city knew there was a problem and did nothing. It did not force the contractor to produce a valid schedule and it did not intervene to create one. The city itself is acting as the top project manager here in case you missed it.

Hmm, I've probably forgotten more about engineering, construction, and project management of large heavy civil infrastructure projects than you will ever know.

Schedules are constantly evolving and a GC can produce a new one every week for all that that matters. What usually happens is the GC gets so tired of producing meaningless schedules because there is more important work to be done. The "schedule" such as it was, was probably meaningless before Carillion even mobilized to the site. In addition, it doesn't take a genius to simply add a week to the completion date with any Change Initiation of any size that comes the GC's way. In the end, Carillion will say that they finished "on budget and on schedule" and they won't be lying because the budget and schedule have changed so many times that in the end, they will finish as per the Revision 542 of the schedule.

The second there are changes, the schedule goes right out the window.

The only thing that the City will know is whether or not the Contractor is dog fucking or not (i.e. does not have sufficient crews to carry out the work. If the contractors are working steady and executing their work in a professional manner, that's all you (as an Owner) can hope for.

If the contractors are working piece-meal and understaffed, that is a different story altogether. But I have not read this accusation in the Globe and Mail, nor anywhere else.

But for now, I will let you live in your dream world about forcing contractors to do anything. (I'm still chuckling at that one.)
 
To me, everything comes down to the accuracy of the Detailed Design.

As an Owner, you live and die by the contract (as does the Contractor, though they tend to twist and squirm and play with logic and wording looking for extras because they underbid the work (as I'm sure Carillion did)).

If the drawings and specs are accurate, you have a leg to stand on in any fight with any Contractor. But if the drawings are full of holes and the specs are just simply a bad cut and paste job from some other job, you're a dead man.

If the Consultant doesn't have really sharp guys on staff, guys who understand that the details are what kill you, the project will turn into a horror show.

My guess is that this is the major problem with Union Station. Shitty Design full of errors and oversights that the Contractor has and will capitalize on.

End of Story.

You can't blame the city for this, and you can't blame Rob Ford.

Blame the guy who did the drawings and specs.
 
When was the last time the government built something on time and with in budget?