You are repeating claims made by Porter but the city is not yet in possession of documentation certifying any of that. The city staff have explicitly said they expect to receive that information in early 2015. You can give your opinion all you like, staff have said they want fact, not opinion, and the executive committee agreed.
Until the city is in possession of properly signed off reports from authorized agencies certifying that is true it is possible that the industry boosters are just downplaying the risks and overstating capabilities.
1) No one is going to certify how long a runway will be extended. The aircraft manufacturer will release take-off and landing runway lengths. But guess what? Aircraft can use shorter than that. The manufacturer only releases the specifications based on maximum take-off weight and maximum-landing weight in standard atmosphere. But atmosphere is virtually never standard, and it's not hard to simply remove some fuel or some cargo to reduce the aircraft weight. There are complex calculations that can be done to determine the EXACT length required for a particular flight, and that data won't be included in ANY report that comes out by ANY regulating body, those calculations will be included in the operating manual for the aircraft. So for 1) we know how long a runway it needs. That data doesn't get "certified", it's simply published by the manufacturer. So you can wait until 2050 if you want, you still aren't going to get an answer to 1) from a certifying body. The maximum take-off run is (not will be, it is, the aircraft is flying, they have already published this data) 3,999ft or 1,219m. The maximum landing distance is 4,400ft or 1,341m. Runway 08/26 is currently 3,988ft or 1,216m. 200m at either end will result in a runway that's 1,616m, or 275m longer than is required. Why ask for 200m either way? Well, initially they didn't. But as the city delays, the odds become more and more likely that Porter might end up with something other than a CS100, so they need a bit extra to be sure. The extra 200m provides sufficient space for alternatives, like the CRJ100, to land (which is ALREADY quieter than the Q400). It's not quite long enough for the CRJ100 to depart at MTOW, but that's a non-issue. It's not hard to reduce the weight at take-off (take less gas or less cargo, and since Porter has no plans to operate flights anywhere near the maximum range of the CRJ100, there's no reason to believe they'd ever want to take full tanks anyway), whereas if you have an emergency, like a fire, you don't necessarily want to fly in circles for an hour to burn off the extra and get down to a lower weight. So you need to have enough room for landing at maximum weight. The other consideration is a safety one. An aircraft can land at any airport they want to if they declare an emergency. Lengthening the island would allow aircraft like CRJ's that do experience emergencies to land there. More useable runways to handle emergencies is always a good thing. I for one would rather see a jet aircraft land at the island in case of an emergency then have to push it further onwards and possibly crash in downtown Mississauga. I know you worry the noise will destroy your precious recreation area, but I assure that the noise and destruction caused by a crash would be much, much worse.
2) That's not Porter's claim, that's the truth about exclusion zones. Don't misunderstand your lack of understanding with what an exclusion is or how it works confuse you.
3) Again, not a "claim", that's a reality. The current approach in the Island is a 3.5 degree slope. A normal approach is 3 degrees. London City Airport has a 6 degree glide slope and jet aircraft land there just fine, aircraft bigger and heavier than the CS100 or the alternatives Porter can consider. The glide slope isn't going to increase by 2.5 degrees because of a 200m change in length. Basic trigonometry. If you suck at math, don't blame Porter.
4) That's not Porter's claim - at the Town Hall Meeting, the Port Authority made it VERY clear that would NOT change noise restrictions. Or are you now question the Port Authority's and the City's "claims", because I got the impression you were on their side?
5) Again, Port Authority and the city made this claim, has nothing to do with Porter claiming anything.
So, the only Porter "claim" in the list is the first one, and you aren't going to get a document that certifies that. For that matter,
you won't get a certification on runway length, exclusion zones or approach slopes, and the other 2 problems you have are "claims" made by the city and the Port Authority, not Porter.
See the bold part for emphasis, and realist that your 5 "points" don't be answered in certification. The information for them is already available. So I say again, "What OTHER concerns do you have?" Because none of your claims here are going to be answered in any way, shape or form by a certifying body.