Premier Doug Ford is proposing a 55 kilometer tunnel under the existing 401, to extend at least from Mississauga to Scarborough, to be used as a freeway and reduce the above ground 401 congestion.
Cost and time required to build to be studied.
When some reporters and politicians dared to ask why this should turn out better than the over proposed time and budget, and still not working projects such as the Eglinton Crosstown, he replied that he hates their negativity and that "the proof is in the pudding".
Well, if the Eglinton Crosstown is the "pudding" it's way too expensive, pretty nasty tasting, and still not ready to eat...
Cost and time required to build to be studied.
When some reporters and politicians dared to ask why this should turn out better than the over proposed time and budget, and still not working projects such as the Eglinton Crosstown, he replied that he hates their negativity and that "the proof is in the pudding".
Well, if the Eglinton Crosstown is the "pudding" it's way too expensive, pretty nasty tasting, and still not ready to eat...