You brought up the point about the area between Leslie and the Don, which is not even the area we're talking about. I brought up the point of the area of Jarvis, Lakeshore and the Gardiner, which
is the area we're talking about.
Since searching is apparently tough let's contrast the two areas shall we?
Here's the area of the DVP and Lakeshore:
https://goo.gl/maps/Vq3X352Qrmv
Not sure if you noticed, but I see mostly low density residential and some industrial / commercial areas including the old Unilever factory. There are 3 major intersection in that area: The Don Roadway leading north to the DVP, Carlaw and Leslie.
Here's the area of the Gardiner near Jarvis:
https://goo.gl/maps/JLkU4soMBvT2
I see a lot more high rises and 4 major intersections namely: Jarvis, Sherbourne, Parliament and Cherry Street. I'll admit that I don't get down the St. Lawrence Market area that often, but the traffic has been crazy the few times I've been in the last few months. That was at noon time. Even right now (9pm on a Thursday night) the traffic is quite heavy.
What do you think will happen when we close the intersection of Lower Jarvis and Lakeshore for Gardiner demolition work? That traffic has to go somewhere and it will be forced onto King, Front, Sherbourne, Parliament, etc. Ditto for the "small number of cars" that will be exiting the DVP at Eastern Avenue or Bayview to get to downtown during construction.
I can also admit that I don't know how long it takes to do demolish a small section of the bridge deck, but it's not a short time. Then we start that process over again at the intersection of Sherboune and Lakeshore, Parliament and Lakeshore, and Cherry and Lakeshore.
Here's an example of a so-called "grand boulevard" or at least it was pitched that way.
https://goo.gl/maps/bcTTeL8ax942
In Richmond Hill, there's a stretch of Highway 7 near Leslie that has a VIVA bus lane (including special red paint) down the middle of it. There's bike lanes on each side, beautiful (and overly complex) glass bus shelters, concrete planters in the middle of the road with flowers and even concrete signs in front of the bus-shelter to tell you what the street names. Naturally, those concrete planters and signs are prime targets for cars that can't quite make a left turn.
Here's the reality: the middle lanes of Hihgway 7 were closed to make way for the bus lane and the overly complex and expensive shelters. When they were done in the middle, the right lanes were closed to build those bike lanes. You'd think that would be it, but they closed the right lanes a second time to paint the bike lanes green and make the pavement markings.
Then they closed the middle lanes again so they could put those flower planters and install those concrete signs. As far as I know, that areas is still an active construction zone. I can't say exactly how long it has been, but it certainly feels like the city of Richmond Hill has been toiling there for years! Sure it looks all nice, but traffic has not improved appreciably in that area and might have gotten worse. There's essentially been construction in that area for years (and they're still not finished.) There's not even a roadway on top or limited space, or lots of high-rises, etc.
As a result, I have no confidence the city of Toronto can be any more efficient in pulling off this kind of project.