Oh get over yourself, your chased your own tail around this enough already, there is clearly room for additional runways, particularly a short one for porter. Pearson already had a plan for one, you lost this point.
See, you need to accept you don't know a damned thing about aviation.
An aircraft, regardless of it's size or characteristics, is given the exact same sized bubble when operating under Instrument Flight Rules, which Porter does. That means it doesn't matter if it's Porter or Emirates' A380 - it still needs the same space. When using parallel runways, they need to be separated by at least 4300' to permit the simultaneous arrival and departure of aircraft without needing to apply this bubble.
With the actual facts out of the way, lets' tackle the additional runway that MIGHT be added at taxiway November. Is it separated more than 4300' from the existing 05/23? No, it isn't. So how does it affect capacity? It allows the simultaneous landing and departing on that parallel system, not parallel departures. Except that ATC still needs to ensure that when the planes are in the air, they still have their safety bubble. As we say in the business, parallel runways that aren't separated by enough room provide "optics". In other words, they look good, the keep customers happy because they see planes coming and going, but they don't add a thing to capacity. A few dozen planes a day, tops. And even if they built it and added 24 flights a day, you're still stuck with other problems.
1) Staffing. You haven't solved that despite your claim that you have by throwing money at it. What makes you think Toronto can pay enough to pull controllers away from places like O'Hare, JFK, Heathrow, etc? And how exactly will they be paid? Or right, by increased user fees (called Air Navigation Fees, or NavCanada Fees, the things people constantly complain about already when they see it on their tickets). So your solution is to pay controllers so much money to fully staff Toronto to run a quadruple operation that air nav fees will need to increase by a significant margin.. What, 20%? Maybe 30%? Or are you underestimating how much it would cost? Or, more likely, are you not estimating at all because you have no clue what you're talking about? Yeah, that's more likely.
2) Bidding. They can't see, "Here you go Porter. Here's your 24 flights." They need to be equitable. Which means Air Canada will probably get 6 of those slots, WestJet will get 6, foreign carriers will probably divide 4 more amongst them, US Airways/American/Delta will split another 2 or 3. That leaves Porter with 2 or 3. How do you magically relocate their operations on 2 or 3 flights a day?
3) How are you planning on selling the higher fees and higher taxes to the public? You haven't addressed that either. Last I checked, the economy isn't exactly booming right now, and airport expansions aren't cheap. The Island seems like it would certainly be cheaper to upgrade than it would be to add another runway at YYZ.
Seriously fuji, quit talking like you have any clue what you're talking about. You've displayed a complete lack of understanding for the business. The more you talk, the bigger a fool you look like.
And I don't see how I've chased my tail. I am able to backup everything I've said. I do see you constantly making claims you can't back up. But let's recap your blunders, shall we?
A) You're wrong about the TSB putting out a report on CS100 performance.
B) You're wrong and that YYZ is not currently building a new runway.
C) You didn't even look at the list of aircraft noise details I provided you.
D) You have no experience in the aviation world.
Now we can add to the list:
E) No concept of aircraft separation under different flight rules.
F) No concept of aircraft arrival/departure spacing.
G) No concept of Simultaneous Parallel Runway Operations.
H) No clue how arrival slots are metered out.
What exactly qualifies you to solve all of Porter's problems given all these things you don't know anything about?