Should Porter expand at Island.

Let Porter expand the airport?

  • Bring on the jets!!

    Votes: 147 75.4%
  • Let's stop this nonsense NOW!

    Votes: 48 24.6%

  • Total voters
    195
The Island isn't trying to expand to accommodate extra airlines. No one is proposing the traffic from Pearson move to YTZ.

Actually Air Canada and Westjet are talking about flying out of the Island. But you missed the basic management point.

You claimed Pearson was at capacity and could not handle any more flights. That was your claim, and what follows logically from that claim is that we have a hard requirement to either expand Pearson, or build additional capacity somewhere else. Why? Because Toronto is growing, our economy is growing, our air travel needs are growing. If we are out of capacity already then we must absolutely expand somewhere.

So, can the Island handle the expansion? A reasonable goal would be to double our capacity over the next fifty years, assuming we experience something like two percent growth rates, starting with say a twenty percent expansion in the near future on a facility that can continue to grow. The Island plainly cannot serve as the long term solution and I doubt it can take twenty percent the traffic served by Pearson. Certainly not without transforming into a radically bigger and busier airport than anyone is comfortable with.

So if your statement is true, that Pearson had zero additional capacity available, it necessarily follows that whether we know how to pay for it or not, and whether we have planned for it or not, we need a major airport expansion that will either be a massive expansion of Pearson itself, or the construction of an additional airport of similar scale elsewhere. Maybe Pickering.

Your new solution? Expropriate land. No problem. Where would you like the 401 moved to?

I can see enough land to put in equivalent runways, in any direction, if you expropriate the right land, without moving any existing runways.

Or where do you want to stick Derry? Of course, you need end-around taxiways as well... so there goes Dixie and Airport Road.

I'm fine with that. Expropriate all the land east and north of the airport and build what is required.


So tell me, when it's all said and done, how are you going to sell the taxpayers on a multi-billion dollar expansion to YYZ or new airport instead of simply adding longer runways to YTZ to add another half dozen flights a day? This is your proposal afterall - your solution to the debate. And I think we're all very anxious to see how you solve these problems.

That's a good question, I don't know. But if your statement is true, it is not really optional, it will have to be done.

And if we have to build a massive airport, why expand the Island?

Feel free to retract your claim that Pearson is really at capacity, in which case, we don't yet need to expand, but then let's move Porter there, into the spare capacity, if you change your mind about it being full.
 
I don't think Pearson is "at capacity". I think it's out of slots that people want to use though.
 
You can't expand to the west....there is a huge dip and creek with deer running around.

you would need level land.....or build runway bridges over the valleys
 
Pearson is operating nowhere near capacity.

And my understanding of the runways there is that in bad weather especially, they use the north south runways. (I could be wrong on this, but that is what I have been told.)

There is no need to in-fill lake Ontario for the sake of convenience for a few fat-cats (or otherwise).
 
Seems like less work than building on water.


Dumping fill in the lake....especially from the Eglinton crosstown subway...would ACTUALLY be cheaper to dump in the lake than haul it 2 hrs north.

A bailey bridge across the channel and voila!!!

Those runway bridges are expensive!!
 
Pearson is operating nowhere near capacity.

And my understanding of the runways there is that in bad weather especially, they use the north south runways. (I could be wrong on this, but that is what I have been told.)

There is no need to in-fill lake Ontario for the sake of convenience for a few fat-cats (or otherwise).

Whoops, bluelaser, your pants fell down.

Well, then perhaps one of you two that believe it's not at capacity can explain why Emirates was told they couldn't come in more often, or why airplanes sit parked on the runway waiting for gates to open up, or why the second something happens that reduces the number of arrivals even by a bit, everyone is suddenly flying in circles waiting for their chance to conduct an approach, or why my company has been told they can't schedule additional flights in or out? My understand of the word "at capacity" is "can't fit anymore." Seems to me that's what's happened.

As for my pants, they come down around the lovely ladies. If you think one guy backing you up helps you out, you're still wrong. You've still demonstrated a fundamental lack of understanding of the aviation industry, and in that respect, your pants have never been up this entire conversation.
 
Pearson is operating nowhere near capacity.

And my understanding of the runways there is that in bad weather especially, they use the north south runways. (I could be wrong on this, but that is what I have been told.)

There is no need to in-fill lake Ontario for the sake of convenience for a few fat-cats (or otherwise).

Of course that website is going to give the best case scenarios for Pearson, since it's an anti-Island airport website. If the pro-Porter site is supposed to be taken with a grain of salt, then so should this one.

Sure, Pearson probably can handle another 220+ flights a day under that so-called "practical maximum". These would have to operate during the traditional mid day and late evening lull, when fewer people want to fly. Hell, get rid of the overnight restrictions and you add another thousand flights, but who would be on them? Putting into really basic terms, do you tell Tim Hortons they can't build a new shop because there is one 3 blocks away? Even though that one is lined up 15 cars deep onto the road? I mean, practically speaking, at 10pm, they have no line up so they have the capacity to handle more people, so why build a new location?

As for the north/south runways, they don't fire them up when the weather goes bad simply to relieve the east/west runways. Planes operate into the wind (as much as into the wind the existing pavement allows anyway, and Bluelaser can address more than I can what cross wind limits they use). If they are using the 15/33's, then it's because the winds favour those runways, and they don't end up using the 3 E/W runways. And god forbid you are at the eastern most gate at terminal 1 and get assigned 15R for departure, you'll feel like you are driving to your destination.
 
Well, then perhaps one of you two that believe it's not at capacity can explain why Emirates was told they couldn't come in more often, or why airplanes sit parked on the runway waiting for gates to open up, or why the second something happens that reduces the number of arrivals even by a bit, everyone is suddenly flying in circles waiting for their chance to conduct an approach, or why my company has been told they can't schedule additional flights in or out? My understand of the word "at capacity" is "can't fit anymore." Seems to me that's what's happened.

As for my pants, they come down around the lovely ladies. If you think one guy backing you up helps you out, you're still wrong. You've still demonstrated a fundamental lack of understanding of the aviation industry, and in that respect, your pants have never been up this entire conversation.

The fact that Pearson is actually building an additional runway destroys everything you said. And you wrote so smugly!

Pull your pants back up and we can discuss the details of moving Porter to Pearson again.
 
Once all of you realize it is not a 'capacity' issue at Pearson......that will influence the Island expansion....then perhaps you can all talk.
 
Actually Air Canada and Westjet are talking about flying out of the Island. But you missed the basic management point.

No, you missed the point, because you said Porter should move to YYZ, and yet have no solution as to how they can be accommodated there. You can talk about how YTZ can't handle increases all you want, the only person talking about moving one airline from one airport to another in this thread is you. So solve the problems you're creating in your solution, don't create fictional new ones to avoid having to defend yourself.

You claimed Pearson was at capacity and could not handle any more flights. That was your claim, and what follows logically from that claim is that we have a hard requirement to either expand Pearson, or build additional capacity somewhere else. Why? Because Toronto is growing, our economy is growing, our air travel needs are growing. If we are out of capacity already then we must absolutely expand somewhere.

Absolutely. I agree. If Pearson as at capacity, we shouldn't be moving more stuff there. So we are in agreement. Now explain how you propose moving Porter there.

So, can the Island handle the expansion? A reasonable goal would be to double our capacity over the next fifty years, assuming we experience something like two percent growth rates, starting with say a twenty percent expansion in the near future on a facility that can continue to grow. The Island plainly cannot serve as the long term solution and I doubt it can take twenty percent the traffic served by Pearson. Certainly not without transforming into a radically bigger and busier airport than anyone is comfortable with.

Absolutely. Which is why I don't endorse airlines swapping airports. You do, however. You want to move Porter to YYZ. Let's keep on topic here and not start drifting into a new discussion. I took you to task on your horrendous solution, and your way of dodging that fact in what I can only assume is an attempt to save face, is to try and divert the discussion. The question is: do we expand YTZ for Porter? Many people say yes. You say no because Porter should move to YYZ. Fine, now explain how you're going to fit them in. It's that simple. All this fluff about YTZ not being able to handle YYZ's traffic is absolutely true, but irrelevant to the discussion at hand.

So if your statement is true, that Pearson had zero additional capacity available, it necessarily follows that whether we know how to pay for it or not, and whether we have planned for it or not, we need a major airport expansion that will either be a massive expansion of Pearson itself, or the construction of an additional airport of similar scale elsewhere. Maybe Pickering.

Absolutely. In the meantime, instead of expanding YTZ, you propose moving Porter to YTZ. Please explain how. Let's get back on topic.

I can see enough land to put in equivalent runways, in any direction, if you expropriate the right land, without moving any existing runways.

I'm fine with that. Expropriate all the land east and north of the airport and build what is required.

That's a good question, I don't know. But if your statement is true, it is not really optional, it will have to be done.

And if we have to build a massive airport, why expand the Island?

Feel free to retract your claim that Pearson is really at capacity, in which case, we don't yet need to expand, but then let's move Porter there, into the spare capacity, if you change your mind about it being full.

You think I'll retract my statement to avoid suggesting a bigger airport is needed just to fit Porter in there? How will that solve the delays I experience flying in and out of Toronto on a daily basis? You think I can use the force and magically create more gates, move aircraft out of my way and open up all the flow restrictions with my mind? I'm pretty awesome, but I'm not that awesome.

Besides, if we're talking about retracting statements, will you retract the one you made claiming TSB will release a report? Or the one that says the TSB will specify how long a runway will be needed? Or your claims that the airport is busier now than it was? It's pretty arrogant of you to suggest other people should retract statements when you repeatedly make false claims and just pretend none of it happened when they're pointed out to you, don't you think?
 
The fact that Pearson is actually building an additional runway destroys everything you said. And you wrote so smugly!

Pull your pants back up and we can discuss the details of moving Porter to Pearson again.

They are? This is news to me. I know they have a PROPOSED runway, planned to be built in the area of November, which will add a paltry few flights an hour in capacity, but that "plan" has been announced, tabled, announced, and retabled so many times that no even knows what status it's in now, let alone the details on cost or feasibility. That also doesn't solve the problem with lack of gates, nor does it solve the problem that they can't manage to staff the 3 runways they have let alone staff a 4th one. You can't just slap a bunch of pavement down and declare capacity increased. I don't see how anything is destroyed. I mean, it's not like I made claims that an agency with the sole purpose of investigating incidents was going to publish a report on the performance characteristics of an airplane that has never had an incident or anything. Now THAT would be destroyed by, you know, facts and reality and stuff.

But then, I guess you skimmed the article that was linked and missed the key word in it all: IF. Let me quote it for you:

If Pearson Airport decides to beef up it’s “airside infrastructure”, it can grow much further.
 
And, SINCE Pearson could expand to grow much further it is time to have an adult conversation about doing that instead of expanding at the island.

The staffing problems, etc, are an example of the inefficiency of running two commercial airports instead of one. Move the island staff to Pearson to work the expanded capacity.
 
Porter provides an outstanding service. When they began flying a few years ago, everybody including Air Canada and the stupid people who lived near the airport (do you remember the welcoming band) tried everything to ensure Porter would fail.
They did succeed and kicked Air Canada's ass. They now want to service new destinations in the South, they are willing to purchase Canadian planes (Bombardier needs help). That's fantastic for the business and leisure traveller.
Where ever I travel when visiting Canada, I fly Porter as much as I can.
They offer the best value and service as far as I'm concerned.
You, Canadian, people should be proud to have such a success story. When flying Porter you're treated well, the planes are comfortable and clean. You are not treated as as animals and cramped in planes from carriers such as Easyjet or other European lowcosts.

My two Euros.
 
And, SINCE Pearson could expand to grow much further it is time to have an adult conversation about doing that instead of expanding at the island.

The staffing problems, etc, are an example of the inefficiency of running two commercial airports instead of one. Move the island staff to Pearson to work the expanded capacity.

Well, if it is indeed NavCanada staffing as someone else suggested, it's not that simple. ATC at YTZ is very different from ATC at YYZ. Just because someone can handle YTZ doesn't mean they can handle YYZ and vice versa. ATC is called the most stressful job in the world, afterall, and those guys are busier than shit, they also happen to have really high failure rates in training. We had a few guys leave the flight deck to go over to ATC over the years, and every single one of them came back having failed to complete training.

Once again, because you have no idea how the industry works, you think something is simple when it's not.
 
Well, if it is indeed NavCanada staffing as someone else suggested, it's not that simple. ATC at YTZ is very different from ATC at YYZ. Just because someone can handle YTZ doesn't mean they can handle YYZ and vice versa. ATC is called the most stressful job in the world, afterall, and those guys are busier than shit, they also happen to have really high failure rates in training. We had a few guys leave the flight deck to go over to ATC over the years, and every single one of them came back having failed to complete training.

Once again, because you have no idea how the industry works, you think something is simple when it's not.

Fire the inappropriate people and use the headcount to hire the right people, retain those with appropriate skills.

You've run out of interesting counter arguments.
 
Fire the inappropriate people and use the headcount to hire the right people, retain those with appropriate skills.

You've run out of interesting counter arguments.

And Fuji , you have not countered how making runway bridges over sensitive areas is better than extending the Island runways with fill from the Eglinton Crosstown.....at considerable savings to the taxpayer.
 
Fire the inappropriate people and use the headcount to hire the right people, retain those with appropriate skills.

You've run out of interesting counter arguments.

What? How do you use a headcount to hire the right people? "We have 7 people, 7 times 3 is 21, therefore we can extrapolate from 21 that Bill, Frank, Tony and Jane are the candidates that will pass our rigorous selection and testing." Is that how your brain works? That would explain a lot. How do you propose a company like Nav Canada, that has essentially never stopped hiring, resolve its staffing issues when it reportedly has a <10% success rate? It can't seem to keep up with attrition from what I've heard despite a non-stop stream of training. You seem to have all the answers, perhaps you should give them a call and tell them what the solution is, I'm sure they'd love to know. Rumour is that it costs over $750,000 to get a trainee through, so if they make it 2/3 of the way before failing out, that's $500k just flushed down the toilet. I know that they, and us given that our fees fund that shitshow they call training, would love to solve the staffing and training problems. Though I suppose it'd be like here and you'd just give the faintest hint of an idea with no details on how to accomplish. "Dear Nav Canada, hire more people and have better success rates in training to solve your staffing problems. Sincerely, Fuji the Magnificent" Unfortunately, it's accomplishing that which isn't that easy, HOW do you get people through training successfully? Do you know they answer? Because they don't seem to. And since you've demonstrated you know absolutely nothing about aviation, I suspect you actually don't have any clue.

My essential argument has always been, and remains, that you have no idea what you're talking about and have no clue about the aviation industry. From the TSB putting out reports that aren't incident investigations, to a lack of understanding of aircraft performance, to fundamental misconceptions about how exclusion zones work... I mean, virtually everything you have said on this subject has either been just plain wrong if was factual, or you've been unable to defend or justify if it's been opinion. You're quick to insult others, to talk down to them, to advise they recant and kowtow at the first sign someone doesn't back up their claims, and yet you completely ignore all the falsehoods you've spread. I can see why you're bored - you obviously thrive on "winning" internet debates. Sadly, you can't win this one, because you've made so many erroneous statements already, the ones that have nothing to do with opinion, that you have no leg to stand on. If someone tells me 2+2=9, it doesn't matter what they might know or think they know about math, I'm not going to trust them to advise me on multivariable calculus, or even punch numbers into a calculator to figure out my fuel burn to make sure I have enough to get from Toronto to Tokyo.

At least I've managed to get you to shut up about noise I suppose. That's something.
 
And Fuji , you have not countered how making runway bridges over sensitive areas is better than extending the Island runways with fill from the Eglinton Crosstown.....at considerable savings to the taxpayer.

I'm still waiting to hear why the TSB would issue a report on aircraft performance. Or how they won't know the size of the exclusion zone without "testing data" when the dimensions are already established.