Should Porter expand at Island.

Let Porter expand the airport?

  • Bring on the jets!!

    Votes: 147 75.4%
  • Let's stop this nonsense NOW!

    Votes: 48 24.6%

  • Total voters
    195
Are you? At what cost? Will we need new ferry terminals? How much will they cost us? Until TSB releases its report you don't really know.

TSB won't put out a report. They only deal with incidents.

Transport Canada might release one...but Transport misses the point of noise. There's two types of aircraft noise ratings: the actual noise, and the noise people think they make.

If you built a huge airliner shaped like a business jet and flew it over people's houses, they wouldn't say boo. But take a small, quiet plane and make it look like a huge airliner, and people complain non-stop. Most airports have actual noise restrictions based on actual noise. These are usually hours of operation restriction to meet noise bylaws. Then they have procedures to deal with "perceived" noise, like only allowing planes that look quiet to turn early. If they get enough complaints about a given type of aircraft, they remove it from the list allowed aircraft allowed to execute the procedure.

Modern aircraft are VERY quiet. An older Dash-8 is louder than many newer jets that are significantly larger and heavier. Dirtier too and worse on fuel. The bigger concern to me, as a pilot, is that there are restrictions depending on what approaches are being done at the island. I don't know all the details, but I do know that the number of arrivals at Pearson is lower during certain conditions because arrivals at the Island need to be protected for. Given that jets take longer to slow, meaning they need to take wider approaches and start further out, I imagine this will make the problem worse. of course, the general public won't hear about that problem, or care, but when I have schedules to meet and passengers with connections to make, a 10 minute delay can be a lot of headache. As a general rule, Island traffic is made to accommodate Pearson, purely because we have more connections than they do. But it's a real concern for the flying professionals.

I'm not saying don't give them jets, I'm just saying noise is irrelevant because people are going to complain anyway, and there are a multitude of other factors that should be considered but won't be.
 
Toronto Island noise restrictions are very limiting so any 'older plane' that barely makes it will still be significantly quieter than at Pearson. Any thought of Porter wanting louder jets would still have to be approved, even if the runway is lengthened.

As I said, I'm in the flight path and the only planes I have ever heard from my balcony was from the air show. I'll assume that unlike them though, any flight out of the Island will be subsonic.

Airshow flights are subsonic too. Trust me, you'll know it when you hear a sonic boom from a distance of a few miles. It'll rattle the walls, shake the ground and sound like a bomb went off down the street. Fighter jets use turbojet engines. Modern airliners use turbofans with high bypass. The higher the bypass, the bigger the fan, the quieter the engine noise (of course, engine noise is only part of the noise an aircraft generates). Fighter jets have no fans, no bypass, no hushkits. That's why a fighter jet engine sounds like the air is tearing - it's just pure noise. Add a huge thundering boom before that tearing and you have a sonic boom. Example included:

https://www.youtube.com/watch?v=lzHZCmfwt7Q

That sonic boom you hear is enough to actually rock an aircraft carrier. If jets went supersonic around a city, within visual range of the ground, windows would shatter. It's powerful stuff.
 
No one has given a real answer to either major point:

1. Why not wait a few months for the noise data from the flight tests, and for the assessment on how long the runway really needs to be? What is the point in approving it without that information?

2. Why is this even needed now that we have a fast express train from Union to Pearson?
 
fuji;4819074[B said:
]No one has given a real answer to either major point:
[/B]
1. Why not wait a few months for the noise data from the flight tests, and for the assessment on how long the runway really needs to be? What is the point in approving it without that information?

2. Why is this even needed now that we have a fast express train from Union to Pearson?


When answers have been given (albeit not to your liking), saying stuff like this just makes you sound obtuse.
 
No one has given a real answer to either major point:...

And you haven't given an answer to your claims about the exclusion zone.


Besides that, even with a runway expansion, the noise limits won't change.

And double besides that, the Union Pearson link isn't running yet.
 
It's a no brained, it's easier to get to than Pearson. I don't know why we're even having this debate, oh I remember because of that STUPID DAVID MILLER!!! Hell, I'll vote for anything that Adam Vaughan & Co are against, if they're against it, it's got to be good for the city!

Vaughan and his comrades think Toronto is some type of village. They pander to the downtown progressives who want art galleries on every corner, bike lanes on every thoroughfare and low income government housing in Forest Hill and Lawrence Park.
 
HELL YA ! If this City ever wants to play with the big boyz it needs to improve porter. I use it all the time for business and personal travel.

Convenient and easy to get too. To be downtown, hope of flight to Ottawa, Montreal or New York and then back with out hitting that 401 traffic it's awesome.

The new jets are quite and I bet you if the runways were already longer and they were landing there no one would know jets were there.
 
And you haven't given an answer to your claims about the exclusion zone.

Besides that, even with a runway expansion, the noise limits won't change.

And double besides that, the Union Pearson link isn't running yet.

The exclusion zone won't be known until the regulator is given the test flight data, at which point they will mandate minimum safe runway and the exclusion zone. That information is due in 2015. It could be what Porter predicts. It could be more. It will certainly be larger than for turboprops.

The noise limits would wind up in court and may be hard to enforce. Porter can and will argue that it should be allowed to continue operating while disputing the city's measurements, then protesting that the city knew the numbers were fuzzy when it approved the jets. It will claim being grounded is an unreasonable penalty, and it will have a point.

Better for the city to make a clear decision with clear information than assume enforcement later will be easy, possible, cheap, timely, or effective. Enforcement AFTER Porter buys the jets would force Porter into insolvency which is a big step the city probably won't take, Deluce playing high stakes poker, but it is hard imagine city government surviving after intentionally and vindictively bankrupting a big employer.

As for Union Pearson, it will be up and running in a couple of months, before the test data from these new planes is even ready. Probably another reason Porter is pushing this, everyone will realize we don't need Jets once the fast rail link to Pearson is online.
 
The exclusion zone won't be known until the regulator is given the test flight data, at which point they will mandate minimum safe runway and the exclusion zone. That information is due in 2015. It could be what Porter predicts. It could be more. It will certainly be larger than for turboprops.

Gee. That didn't stop you from claiming otherwise.

The noise limits would wind up in court and may be hard to enforce. Porter can and will argue that it should be allowed to continue operating while disputing the city's measurements, then protesting that the city knew the numbers were fuzzy when it approved the jets. It will claim being grounded is an unreasonable penalty, and it will have a point.
Conspiracy theory.

Another of your error is that city approval is needed for the runway extension, not the choice of planes. The jets are Porter's choice as long as they meet the city's noise limits.


As for Union Pearson, it will be up and running in a couple of months....

Actually spring 2015 is the projected date.
 
Gee. That didn't stop you from claiming otherwise.

From my first post on this thread my position has been to agree with city staff that we should wait until have facts hand. The exclusion zone could indeed east a massive swath of the harbou, or could be more modest We won't know until the report from the regulator is completed in 2015.

Conspiracy theory.

Not at all, once Porter is flying those jets it will be up to the city to try and enforce noise limits and if you think porter won't use every legal means at its disposal to keep from being grounded you are crazy. Having the noise data is crucial to knowing whether Porter even had a way of making this quiet enough.

Another of your error is that city approval is needed for the runway extension, not the choice of planes. The jets are Porter's choice as long as they meet the city's noise limits.

Which approval should not be given until we have all the facts.

Actually spring 2015 is the projected date.

In other words, long before jets will be flying, we will have that fast rail link to Pearson. A rail link that is already approved, funded, and far along in its construction.

With that in operation, what is the value of jets on the island? The rail link to Pearson is as almost as fast as the porter shuttle and ferry trip...
 
No one has given a real answer to either major point:

1. Why not wait a few months for the noise data from the flight tests, and for the assessment on how long the runway really needs to be? What is the point in approving it without that information?

2. Why is this even needed now that we have a fast express train from Union to Pearson?

I doubt a few months either way makes any difference.

Is the rail link to Pearson operational, what's the travel time from the station to airport?

Doesn't Toronto need more capacity? A small airport for shorter flights with smaller planes is much easier than the mega-airport Pearson is…
 
I doubt a few months either way makes any difference.

Is the rail link to Pearson operational, what's the travel time from the station to airport?

Doesn't Toronto need more capacity? A small airport for shorter flights with smaller planes is much easier than the mega-airport Pearson is...

The shorter flights thing is handled pretty well without jets.

The train from Union is still under construction but should be running next year. It will take 25min, running every fifteen minutes. The porter shuttle from Union takes not much less than that by the time you cross the water on the ferry. And of course the main draw with that train is that it's reliable, no unpredictable traffic delays.

Not saying this makes the island useless, but it does mean we don't need it so badly we need to sacrifice other things. If the jets really are pretty quiet and the runway and exclusion zone don't interfere much with boating and other recreation, why not?

But we ought not get caught up in the idea that this is solving a big problem when that rail link will make Pearson 10x more convenient than it is now.
 
Im still waiting for details on what this 'Environmental Disaster' will be if a causeway was built for a runway.

causeways are built all the time. Look at Hong Kong. Look at Lake Eugenia.

For or the poster...please outline the details of this environmental catastrophe you speak of?
 
Without knowing the specifics of Porter's/Toronto Harbour Commission's plans, it's hard to say exactly what the environmental degradation will be.

Depending on the type of fill, the controls used to contain it and/or what is churned up, etc., the level of damage could range from significant to catastrophic.

Further, the Harbourfront is still a spawning ground for fish (affected by fill + construction.) The Island is still a major stopover for migratory birds (severely affected by planes - along with being a safety issue for passengers & crew, etc.) Water quality during and post-construction is an issue of concern, particularly in the case of fuel spills, along with other 'waste'. Not only is the lake and Harbourfront a public area, it is still Toronto's source of drinking water.

While I only occasionally agree with fuji, in this case I agree that there is no need to rush construction of an intrusive project on public lands without a full technical review and environmental assessment. There is a reason that there are few, if any, airports in the downtown core of a major metropolitan area on or near fresh water, so if 'we' are to proceed, caution should be in order.
 
HELL YA ! If this City ever wants to play with the big boyz it needs to improve porter. I use it all the time for business and personal travel.

Convenient and easy to get too. To be downtown, hope of flight to Ottawa, Montreal or New York and then back with out hitting that 401 traffic it's awesome.

The new jets are quite and I bet you if the runways were already longer and they were landing there no one would know jets were there.

As this city grows, and yes the population will increase, it just makes sense to have an alternate airport that can quickly get people in and out of the downtown core.

I know people think that by allowing Porter a few more planes, all hell will break loose and the downtown core will grind to a halt. What if I was to say they were planning to put a terminal downtown that would handle 73 million people annually? Considering it already exists, it's called "Union Station" I don't see how adding another couple million travelers annually to BBTCA between the hours of 5:30 AM and midnight will make a huge impact. If you do the math, 2 million people over the course of the year divided by the hours of operation, works out to a measly 5 additional people per minute.

Also, did you know that in 1967 BBTCA had upwards of 660 commercial flights per day? Considering the population almost 50 years ago, that's a huge number. I don't think even with Porter's plans for expansion they will come close to that.
 
The shorter flights thing is handled pretty well without jets.

The train from Union is still under construction but should be running next year. It will take 25min, running every fifteen minutes. The porter shuttle from Union takes not much less than that by the time you cross the water on the ferry. And of course the main draw with that train is that it's reliable, no unpredictable traffic delays.

Not saying this makes the island useless, but it does mean we don't need it so badly we need to sacrifice other things. If the jets really are pretty quiet and the runway and exclusion zone don't interfere much with boating and other recreation, why not?

But we ought not get caught up in the idea that this is solving a big problem when that rail link will make Pearson 10x more convenient than it is now.

Isn't there also a tunnel or something planned for the island so you don't gave to take that silly ferry ride?

Train to Pearson should be awesome but I'd rather skip Pearson if I could
 
Isn't there also a tunnel or something planned for the island so you don't gave to take that silly ferry ride?

Train to Pearson should be awesome but I'd rather skip Pearson if I could

Sure. The train to Pearson reduces the island airport to a "nice to have" priority rather than a "must have". An "I'd rather" versus an "I need".

As such we need to compare it with other "nice to have" things, like peace and quiet, recreational boating, undisturbed park land.

The island airport is no longer really critical to business travel now that the Union Pearson rail link is solving the problem more effectively and in at a larger scale. The UP link brings in business travelers from Europe and Asia, not only regional. But even regionally, there are more flights from Pearson. And with the automated passport/border controls now online at Pearson, waiting times there are now really low.

It is the better solution and had minimal impact on anything else.