McGuinty's new transit plan - $17.5b

Questor

New member
Sep 15, 2001
4,546
1
0
Wow! They finally did it. Its about time. This new plan is way overdue. New subways, dedicated light rail lines. New GO lines, and GO bus lines. Its all there. The good part is the province will pay 2/3 and hopefully the feds will pay 1/3. Sounds like an offer they will not be able to refuse. The province also claims they will help pay maintenance cost once it is up and running.
http://www.premier.gov.on.ca/news/Product.asp?ProductID=1385

For a map, go to:
http://www.premier.gov.on.ca/documents/MovingOntarioMap.pdf

MOVEONTARIO 2020 PROJECTS
GO Transit Commuter Rail

GO Lakeshore West rail line capacity expansion by adding a third track from Port Credit to Oakville
GO Lakeshore West rail line capacity expansion by adding a third track from Burlington to Hamilton
GO Lakeshore East rail line capacity expansion by adding a third track from Union Station to Scarborough
GO Lakeshore East rail line extension from Oshawa to Bowmanville
GO Lakeshore rail line electrification (SuperGO)
GO Milton rail line capacity expansion from Union Station to Milton
GO Georgetown rail line capacity expansion from Union Station to Georgetown
GO Bradford rail line capacity expansion from Union Station to Bradford
GO Bradford rail line extension and capacity expansion from Bradford to Barrie
GO Richmond Hill rail line capacity expansion from Union Station to Richmond Hill
GO Richmond Hill rail line extension to Aurora Road
GO Stouffville rail line capacity expansion from Union Station to Stouffville and extension of the line to Uxbridge
New GO Crosstown rail line between Weston Road and the Don Valley
New GO Crosstown rail line between the Don Valley and Agincourt
New GO rail line from Union Station to Bolton
New GO rail line on the Havelock line from Agincourt to Pickering
New GO rail line on the Seaton line from Agincourt to Brock Road in Pickering
GO Bus Rapid Transit(BRT)

GO Bus Rapid Transit along Highway 403 from Oakville GO rail station to Mississauga
Mississauga Transitway west of Mississauga City Centre to Winston Churchill Boulevard
Mississauga Transitway east of Mississauga City Centre to Renforth Drive
GO Bus Rapid Transit northwest Toronto link from Renforth Drive to York University
GO Bus Rapid Transit on Markham Road from Highway 407 in Markham to Highway 401
GO Bus Rapid Transit on Highway 401 from Markham Road in Scarborough to Pickering GO rail station
GO Bus Rapid Transit connector on Highway 427 from Renforth Drive to Highway 407
GO Bus Rapid Transit along Highway 407 from York University to Langstaff (Yonge Street) and on to Markham Road
GO Bus Rapid Transit along Highway 407 from Burlington to Highway 401
GO Bus Rapid Transit along Highway 407 from Highway 401 to Highway 427
GO Bus Rapid Transit along Highway 407 from Highway 427 to York University
Subway and Other Rapid Transit

Yonge subway line extension north from Finch station to Highway 7 (Langstaff)
VIVA Markham North-South Link from Markham Centre to Don Mills station
Pearson Air-Rail link to Union Station
Hamilton east-west rapid transit on King/Main Streets from Eastgate Mall to McMaster University
Hamilton north-south rapid transit on James/Upper James Streets from Rymal Road to King Street
Brampton Acceleride on Queen Street from Main Street to Highway 50
Hurontario Light Rail Transit from Queen Street in Brampton to Lakeshore Road in Mississauga
Eglinton Avenue Light Rail Transit from Renforth Drive to Kennedy Road in Scarborough
Yonge Bus Rapid Transit busway from Finch station to Steeles Avenue
Dundas Street West Light Rail Transit from Kipling station to Hurontario Street
Scarborough RT extension from McCowan station to Sheppard Avenue
Sheppard Avenue Light Rail Transit from Don Mills Road to Morningside Avenue
Finch Avenue West Light Rail Transit from Highway 27 to Yonge Street
Don Mills Road Light Rail Transit from Steeles Avenue to the Bloor-Danforth subway
Jane Street Light Rail Transit from Steeles Avenue to Jane station on the Bloor-Danforth subway
Malvern Light Rail Transit from Kennedy station to Malvern
Waterfront West Light Rail Transit from Union Station to Long Branch
VIVA Yonge Street from Steeles Avenue to Highway 7 (Langstaff)
VIVA Yonge Street from Highway 7 (Langstaff) to 19th Avenue in Richmond Hill
VIVA Yonge Street from 19th Avenue to Newmarket
VIVA Highway 7 from Highway 50 to Yonge Street (Langstaff)
VIVA Highway 7 from Yonge Street (Langstaff) to Cornell
Durham rapid transit line on Highway 2 from Oshawa to Pickering
Spadina subway line extension north from Downsview station to Highway 7 (Vaughan Corporate Centre)
*Projects subject to the review of the Greater Toronto Transportation Authority.

The Government of Ontario also announced today it will fund up to two-thirds of the project costs for Kitchener-Waterloo's rapid transit plan. The government will work with the region to request the balance of funding from the federal government.


--------------------------------------------------------------------------------
 
I have to agree, the Fiberals are at it again, making up promises that they know they will never keep.

Have they posted how much all of that is going to cost? Hmm?

Oh, and where is the money going to be coming from? The Federal Government you say?

Pfft, more tax and spend twaddle from the Liberals.
 
Compromised said:
Pfft, more tax and spend twaddle from the Liberals.

Unlike, say, the Conservatives? lol. :p

At least the Libs are making promises that have to do with public transportation. It's a step in the right direction.
 
Sheik said:
Yeah and there is an election in the fall and they are knocking off early this summer......

I doubt anything here is going to pan out knowing how many election promises have already been broken.

I think you are right that this whole scheme is timed for an upcoming election. And I agree that the Libs are not to be trusted. But the good part is that now the pressure is on all parties to come up with a plan that is competitive. With an election coming up, they have to talk about it. Transit just got bumped to the top of the political agenda. What they do about it after the election remains to be seen.

Of course a key to the whole thing is federal funding for 33%. But can the feds afford to say no when they are in a precarious minority postion? Nope, I think this is definitely good news. Governments have to talk about it and propose it before they can actually do anything. To just dismiss it as meaningless election posturing is being a tad cynical, in my opinion. Its up to the citizenry to make them follow through now, at both the federal and provincial level. It does no good just to dismiss it and say it will never happen.
 
Compromised said:
I have to agree, the Fiberals are at it again, making up promises that they know they will never keep.

Have they posted how much all of that is going to cost? Hmm?

Oh, and where is the money going to be coming from? The Federal Government you say?

Pfft, more tax and spend twaddle from the Liberals.
Yup, the cost is even in the tile of this thread you're contributing to. And the Conservatives are already complaining the whole thing's a steal from their platform (which in typical Con fashion promises tax cuts and lotsa spending all financed by 'efficiency savings". Like the ones Mad Mike trashed us with)

The money comes from us, you big silly. Now stop whining and make sure we get something useful for it.
 
Election or no election, we can not keep putting off imporving our mass transit system.

Sheppard was the last major transit initiative in the GTA as far as I can remember.

Quite simply, the TTC should be expanding the subway system on an ongoing basis just like they were up to the early 80's.

I would add to this list an Eglinton Subway line for example. Enough fucking around already.

Simply put, we can't continue to ignore the growth that is occuring around the GTA. If we do, it's going to severely bit us in the ass.

John Tory will need to state his position on this issue. If he isn't as good or better than McSquinty, then I vote for McSquinty.
 
Compromised said:
I have to agree, the Fiberals are at it again, making up promises that they know they will never keep.

Have they posted how much all of that is going to cost? Hmm?

Oh, and where is the money going to be coming from? The Federal Government you say?

Pfft, more tax and spend twaddle from the Liberals.
Yup they did, the cost is even in the title of this thread you're contributing to.

And the Conservatives are already complaining the whole thing's a steal from their platform (which in typical Con fashion promises tax cuts and lotsa spending all financed by 'efficiency savings'.

Like the ones Mad Mike trashed us with)

Could be worse. Like another SlyDome.
 
Sheik said:
How quickly ye forget, Slydome, Petersen gave the contract to the president of the ontario liberal party and allowed the costs to balloon out of control....

Rae said he could spend us out of our recession and saddled us with a record deficit and a huge debtload. Not only that, he was the one that started closing hospitals and introduced Rae days in order to cut down on spending that was out of control by HIS government.

Mad Mike comes in made promises to slash the spending, get the deficit dragon slain and start reducing the debt. He kept em but at the expense of pissing off a lot of people who had grown accustomed to taking things for granted.

Harris retires, Eves comes in, no one likes him and liberals make all these election promises only to break the good ones and keep the bad ones....

I dont care who fucking runs the province, we need someone who can keep the spending under control (spend no more than we have coming in) and keep everyone happy (a next to impossible task) without making promises they cannot keep or have no intention of keeping.
Well, thanks for that little ray of sunshine, Cupcake. How do you get out of bed in the morning?
 
Finally a step in the right direction, going forward with public transit.

I will still vote conservative.
 
How about not letting anyone vote who believes them? McGuinty wasn't half as dumb promising as the Taxpayers' Federation asking him to.
 
Does this mean I won't have to take a train to oakville and then a bus to burlington, on the weekends?? Sheesh. And instead, just take one train and go all the way through, to burlington? And maybe transit will keep running till 2am? instead of 11pm last bus? sheesh.
 
Sheik said:
Yeah and there is an election in the fall and they are knocking off early this summer......

I doubt anything here is going to pan out knowing how many election promises have already been broken.


Oh sooo true Sheik. So, pathetically true. It is a shopping list designed to please every riding.

Enduser
 
Dash said:
Does this mean I won't have to take a train to oakville and then a bus to burlington, on the weekends?? Sheesh. And instead, just take one train and go all the way through, to burlington? And maybe transit will keep running till 2am? instead of 11pm last bus? sheesh.
Likely not; from the sketchy details so far, it's just a wider reaching version of the commutershed we haver now: focussed on dumping exurbanites into downtown offiiceland and returning them to their bedroom ghettos twice a day. For a vision that services transportation needs of a larger, healthy GTA—like getting folks from Markham to Mississauga and back anytime—you'll need better pols and planners than any I've detected.
 
As for what sheik said: I always wondered if any one of us lied to get a job, then got caught, we'd lose the job why isn't it the same for politicians? I mean, it is SO blatant that they promise the world to get in, then once there they fuck us up the ass like all the rest.

There's an article in the Sun today about this plan but there is a nice little line buried in there that causes concern: It goes something like: This is the TTC's plan, and when they proposed this they noted that the flaw was they didn't know how they'd cover the operating costs of the new lines. The answer to that question is "since it's going to take so long to complete, they'll figure it out along the way..." lol That's the funniest thing I've ever heard!
 
tboy said:
There's an article in the Sun today about this plan but there is a nice little line buried in there that causes concern: It goes something like: This is the TTC's plan, and when they proposed this they noted that the flaw was they didn't know how they'd cover the operating costs of the new lines. The answer to that question is "since it's going to take so long to complete, they'll figure it out along the way..." lol That's the funniest thing I've ever heard!

They've been doing it that way since they started building toronto a 100 years ago.
 
Every 50 years or so, the state (province in this case) has to invest in something big. 40 years ago it was the Nuke plants in Ontario, which of course, since done by he government, cost way too much.
However, the plants still soilder on, producing 40 % of our power.
It's time for a non-partisan infrustructure build.
I'd rather see some big capital dollars spent on something new, and hopefully successfull, instead of the typical operating dollar creep that is typical of Every goverment.
One question, however, what about the Promised and stopped, Eglinton subway line?
 
Well, with this new plan they are talking about an LRT line on Eglinton. Believe it or not back in the early 80's they were talking about a monorail line that ran to the airport and out to Scarborough Town Centre. Best idea anyone had but as with government and great ideas, it didn't happen.

I just hope if they do put an LRT in it's elevated.
 
I'm all for transit, but the timing of this is suspect, and the "experts" that I have talked to say that the price tag seems low.

As for infrastructure, I agree that it has to be kept up. But I am curious just how McGuinty plans to build more nuke plants and do the transit. Once again, I think he is just trying to be all things to all people.
 
There is no way they are going to do all that.
They should but the cost's would be more then stated.
Besides how are they going to put a light air rapid line from Renforth to Kennedy on Eglinton? Where are they going to put it? over the street?