ok guys heres the scoop,I have a lot in town and want to start a house three bedroom bungalow,have studied the framing part and think i can do that,i did help a friend with a big addition,now heres my question,if i hired to dig the hole,put in the footings,poor the foundation,all the drainage,service,back fill,then ready for framing,what would the approximate cost be,I'm thinking 40,000 am i close,thanks
 
your best bet is to get 5 estimates.

Toss out the highest one, as they do not want your work.

Toss out the lowest one, as they will hit you for extras.

The one in the middle is the one you want to look at.

You are best advised to go to an architect in that you will need detailed plans to get permits.
This architect will be able to guide you in the things you need for the site work and local requirements.
 
dig the hole approx. 6 to 8 grand then survey the footings 500 then footings and foundation depends on what the height of basement is. If you go with 8 ft then you can use standard forms and save a bundle if 9 ft then you need custom forms and cost is almost double.but 40 grand should put you in the ballpark +- 5 grand.
 
Dig a whole close to $8gs if there is no demolition involved. Footings around $5. Block foundation : line feet x :3 / by 4 times high(12 course 8' or 14 course on a 9' ceiling) cost $8 to $9 a block. Do the math or pm with details and I'll tell you
 
You are best advised to go to an architect in that you will need detailed plans to get permits.
This architect will be able to guide you in the things you need for the site work and local requirements.

Papasmerf is 100% correct with this.
 
before you start digging, you need to get building permit, have your drawings approved etc... I don't think you can just hire people and start building
 
Finishing interior can be half or more of total construction, you need to decide how far you wish to "splurge" and watch your budget. For sure, it will cost more than you expect. I have experience!
Doug
 
Built my own place and it was years of hard work, but was one of my key goals in life. 2 of us did most of the grunt work and I hired a trades guy, who does super work.... but with a no rush policy. I found there were surprises, many of them costly, but in the end, everything was quality. Everything cost way more than I expected, plus I had to do modifications due to terrain.

Do count on some expensive surprises somewhere along the way.

DO NOT TRY AND SHORT CUT ANY REQUIREMENTS! The building inspectors will make your life miserable. They want quality work within code and specs. They will be hard on you anyway, but if you are honest and try to work with them, and ask them for solutions, it will make it easier. Yes, they did add on tons of extra expenses for me, example forcing me to almost totally finish a basement on exterior walls.

In the end, the product was much more beautiful than I imagined, and it has gone up alot in value. I learned alot doing it, so much so that I now get a lot of contruction tasks at my regular job.

Only downside is I am good on paper, but a bit tight day to day. However, that is the temporary issue of owning 2 houses.

This may sound really odd to you, but after consuming myself in this project for a number of years, I was a bit down when it was actually finished. I sometimes think to sell it (and people ask me all the time to buy it) and start a new project.
People I know might kill me if I do though.

However, I think realistically about the energy level that was involved in this and I don't know if I have the gas in the tank to take on something like that again.

My suggestion.... is get a skilled tradesman that you trust.... treat him like gold... do not pressure him... it works awesome.... he also got me reputable contacts. Do the same with them. If you want rush, you will get worse quality and pay more.

Never worked so hard in my life, but worth it, I suppose.

One other tip: I used quality material, but on sales, or discontinued, etc. - Kitchen, flooring - all that sort of stuff. In the end it worked. I even got some custom made windows for almost nothing..... orders that people failed to pick up and were out in trailers... you had to get close to size you wanted and modify.


One other surprise: at the end the amount of dump truck loads of fill..... it was costly and never-ending.
 
This may sound really odd to you, but after consuming myself in this project for a number of years, I was a bit down when it was actually finished. I sometimes think to sell it (and people ask me all the time to buy it) and start a new project.
People I know might kill me if I do though.

However, I think realistically about the energy level that was involved in this and I don't know if I have the gas in the tank to take on something like that again.

.

You could try another big project - boat for example?
 
Absolutely get an architect
Absolutely check with the city for permits and variances
Absolutely check with water, gas, and power companies

You should be paying between $125-150 per square foot for standard finishes
 
i have already checked building permits,driveway permits,i want poured foundation,i have plans already,just wanted to get an idea before i start hiring the tradesman,and you guys are a great help,i think I'm going into this with pretty good idea of how i will do this,thanks to all of has.
 
Advice to me to restore a boat. I appreciate it, but been dabbling in that for a while.

http://youtu.be/3O6G443joMQ

Here is one boat exactly like one I was working on........ people would not believe me when I told them how fast it is. Anyway Blew the motor.... not a big loss because sold parts for more than I bought it for.... the big issue... I got to stay away from the speed boats.... reason you get complacent to how much danger you can be be in if something goes wrong.