Metrolinx CEO admits that Line 6 cannot handle the Toronto winter

Finally Toronto is getting their downtown relief line. Thirty years way overdue. Extending line 2 to Scarborough is smarter than any LRT plan and badly needed to replace the outdated RT. No room on the south side of Jane Street for and LRT and the rich nimbys in the area were gonna put a stop to it anyways. Eglington should've been a subway to begin with. Bus lanes are for the burbs not the big city.
it is? When? How much? will it work? I can see the Thug is already parcelling land around the 20 years in the making, $30billion and still growing line to his developer buddies.

Scarborough "subways, subways, subways!" Really? Already costs have grown to $10billion plus from a budgeted $2billion. Timeline a decade plus if at all. The technical and construction difficulties encountered are monumental. Don't hang ur hat on this line being completed in your lifetime.

Eglinton is a "subway" where warranted by limited road space above it, except of course in Thug's own hood where even though the road is wide enough for two 747 jet liners travelling both east and west and the population density is feeble. Basically $2billion in taxpayer $$$$s flushed down the toilet for absolutely no rational reason by the Thug.

Scarborough, North York, Etobicoke-York are the burbs. Thus according to you they deserve bus lanes.
 
Last edited:
  • Like
Reactions: Frankfooter
it is? When? How much? will it work? I can see the Thug is already parcelling land around the 20 years in the making, $30billion and still growing line to his developer buddies.

Scarborough "subways, subways, subways!" Really? Already costs have grown to $10billion plus from a budgeted $2billion. Timeline a decade plus if at all. The technical and construction difficulties encountered are monumental. Don't hang ur hat on this line being completed in your lifetime.

Eglinton is a "subway" where warranted by limited road space above it, except of course in Thug's own hood where even though the road is wide enough for two 747 jet liners travelling both east and west and the population density is feeble. Basically $2billion in taxpayer $$$$s flushed down the toilet for absolutely no rational reason by the Thug.

Scarborough, North York, Etobicoke-York are the burbs. Thus according to you they deserve bus lanes.
North York, Etobicoke have subways too.
 
  • Like
Reactions: mandrill
North York, Etobicoke have subways too.
So, "bus lanes are for the burbs", as you previously stated, are now not for the burbs anymore?

U sound as confused, mixed up and schizoid as Mandy.
 
  • Like
Reactions: Frankfooter
View attachment 531025

The thread you obsessively hate so much just broke 1 Million views, Anby.

Your threads get a couple of hundred views.

Comparatively, my big thread is like a proud oak tree, stately and beautiful and tall. Your threads are like little cabbages and carrots barely rising above the vegetable field.

Just telling it like it is.

Sure, but its only got about a dozen posts from other terb members.
The name keeps changing so that means the link keeps changing.
The only thing that would not change is some uploaded image which likely was added to some SM post that went viral.

I mean look, you have to post about here because nobody from the board would even see your bragging otherwise.
 
Eglington Crosstown and Finch West are the two LRT projects from Transit City that DoFo kept. Eglington should've been a subway from the beginning. Transit City was a stupid plan and would've been scrapped no matter who the Premier was. Scarborough is the third most populated borough in Toronto and the least funded. It needs a subway extension for sure. DT relief line should've been priority numero uno.

Nope, LRT is the right choice for the population density. Sheppard should be LRT. Scarborough should be LRT.
But all DoFo hires should be canned and replaced with people who can do the job.
 
Nope, LRT is the right choice for the population density. Sheppard should be LRT. Scarborough should be LRT.
But all DoFo hires should be canned and replaced with people who can do the job.
That's small city thinking. Then again you believe in 15 minute cities.
 
  • Like
Reactions: mandrill
So, "bus lanes are for the burbs", as you previously stated, are now not for the burbs anymore?

U sound as confused, mixed up and schizoid as Mandy.
You know I meant outside the Toronto proper. Bus lanes are stupid for major cities that don't have 8 lanes of roadway.
 
  • Like
Reactions: mandrill
No you don't. Your ideology isn't for everyone. Some folks want to have a family and live in the burbs. Can't do that in the city.

Sure, if you want hour long commutes that's your choice.
I just think the burbs are the worst of everything.
But don't diss the 15 minute city if you don't understand it or why someone would like it.
I love being 15 minutes away from everything I want.
 
Sure, if you want hour long commutes that's your choice.
I just think the burbs are the worst of everything.
But don't diss the 15 minute city if you don't understand it or why someone would like it.
I love being 15 minutes away from everything I want.
I am 15 minutes away from many things as well. And using the subway is great. Using the bus on the other hand is a different story. I have no plans on using the LRTs.
 
Metrolinx CEO acknowledges launch problems with Finch West LRT


The head of Ontario's transit agency says officials kept full bus service on Finch Avenue West after the launch of a new light rail service because they were expecting teething problems.

Metrolinx CEO Michael Lindsay acknowledged in a social media post on Friday that the new Finch West LRT has struggled on cold days since it launched in December.


"Knowing that we would face challenges like this is why we decided with the TTC to keep bus service ready in parallel for this ramp up phase of operations," he wrote.

As temperatures have dropped deep into the negatives, service on the line has been repeatedly suspended because of issues with the switches used to control trains on the line.

On Boxing Day, for example, trains stopped running for several hours throughout the day while the TTC tried to deal with "multiple switch issues" along the Finch West LRT.

Lindsay suggested the problems came from ice and snow clogging the switches, stopping them from working and forcing trains to grind to a halt.

"Winter conditions present challenges to railways across the country. One of the classic maintenance challenges is making sure that the switches that guide vehicles from track to track are free of ice and snow," he wrote.


Related video: Eglinton LRT to open 'early in February': Ford (Global News)



View on WatchView on Watch


"Whereas freight rail operators often literally use flamethrowers to do the job - Line 6 has electric heaters which melt snow and ice. Perfecting the use of heaters, along with the deployment of wayside staff to manually clear ice and snow is something which we continue to work and focus on."


Lindsay said the configuration of the rails forced the Finch West LRT to use electric heaters instead of gas, part of the early teething problems. He said buses had been kept on regular schedules on Finch to accommodate the problems.

Despite the problems, Lindsay said Finch West has a record of operating 94 per cent of the time without issues over its first month.


"Can promise you that we will continue to refine processes, deploy additional resources, and support all teams as they gain experience in operating and maintaining the line," he wrote.

A spokesperson for the TTC said performance on the Finch West LRT was improving over time.

"Delays are all relative," they said. "Some are very minor and involve things like pedestrian incursions or debris on the track that are outside our control, and some are a bit longer."

Video: Toronto pushes forward effort to give signal priority to new LRTs and streetcars
 
Metrolinx CEO acknowledges launch problems with Finch West LRT


The head of Ontario's transit agency says officials kept full bus service on Finch Avenue West after the launch of a new light rail service because they were expecting teething problems.

Metrolinx CEO Michael Lindsay acknowledged in a social media post on Friday that the new Finch West LRT has struggled on cold days since it launched in December.


"Knowing that we would face challenges like this is why we decided with the TTC to keep bus service ready in parallel for this ramp up phase of operations," he wrote.

As temperatures have dropped deep into the negatives, service on the line has been repeatedly suspended because of issues with the switches used to control trains on the line.

On Boxing Day, for example, trains stopped running for several hours throughout the day while the TTC tried to deal with "multiple switch issues" along the Finch West LRT.

Lindsay suggested the problems came from ice and snow clogging the switches, stopping them from working and forcing trains to grind to a halt.

"Winter conditions present challenges to railways across the country. One of the classic maintenance challenges is making sure that the switches that guide vehicles from track to track are free of ice and snow," he wrote.


Related video: Eglinton LRT to open 'early in February': Ford (Global News)
View on WatchView on Watch


"Whereas freight rail operators often literally use flamethrowers to do the job - Line 6 has electric heaters which melt snow and ice. Perfecting the use of heaters, along with the deployment of wayside staff to manually clear ice and snow is something which we continue to work and focus on."


Lindsay said the configuration of the rails forced the Finch West LRT to use electric heaters instead of gas, part of the early teething problems. He said buses had been kept on regular schedules on Finch to accommodate the problems.

Despite the problems, Lindsay said Finch West has a record of operating 94 per cent of the time without issues over its first month.


"Can promise you that we will continue to refine processes, deploy additional resources, and support all teams as they gain experience in operating and maintaining the line," he wrote.

A spokesperson for the TTC said performance on the Finch West LRT was improving over time.

"Delays are all relative," they said. "Some are very minor and involve things like pedestrian incursions or debris on the track that are outside our control, and some are a bit longer."

Video: Toronto pushes forward effort to give signal priority to new LRTs and streetcars
The above confirms, the blame, fault and the dead cat falls completely and fully onto "Can't He Ever Do Anything Right?" Ford's ample lap