Metrolinx is simply the owner. Tough to blame them directly. (Though as owner, they would be responsible to TTC and then Metrolinx would go after the General Contractor / Engineer (big time) that was doing the work.
Aplus General Contracting is building the GO Station at Bloor, just east of Dundas West. They were the ones driving the piles (well, most likely it was a subcontractor), not Metrolinx. (Thoiugh Aplus is working for Metrolinx.).
An investigation will need to be done.
There are a couple of possibilities.
1. The actual position of the subway tunnel and what was shown on the contract drawings that Aplus is using were not correct.
2. The pile driver working for Aplus did not properly locate or drive his piles correctly given the location of the tunnel.
So it could go either way - it could be the pile driver's fault, or it could be whoever designed the new GO Station's fault
Too bad someone didn't think to do a proper total station survey BEFORE they started banging piles into the ground. But hind sight is always 20 20.
BTW, really stupid to drive piles so close to a tunnel, even if you had figured you would miss the tunnel. When you drive piles, you create A LOT of pressure in the soil adjacent to the pile and you can easily blow out a tunnel.