Ontario Hydro is being run by short sighted individuals who've pulled the wool over successive governments for decades, by espousing the benefits of steam powered hydro electric generation and their nuclear program was their gem stone.
Quebec had it right, back in the early 70s, they built their big dam projects on James Bay. This has led to jobs in the North of Quebec, kept their hydro rates low and their utility out of debt and able to fund other big dam projects like the one in Labrador. BC has had larger dams built by industries that have closed shop, but the dams still stand having been taken over by the province and have generated power for the people of BC and so much so that they sold surplus power to California during their crisis. Manitoba completed a big dam project in their northern part, Thompson I believe and upgraded their grid as well. Newfoundland is going ahead with their own project in Muskrat Falls, as Hydro Quebec is reaping most of the profits from the Churchill Falls project in Labrador, which they bank rolled.
Ontarians have been duped by Ontario Hydro by allowing the nuclear debacle to ever take place, then building another one just down the highway. The cost over-runs from the original project should have been a wake up call to stop any new nukes from being built, but they went ahead anyways. Then the refurbishment of Pickering, because Nukes have a life span, which went over budget. Original cost of a little less than $460 million went up to $1.25 billion. The money wasted on nukes also had a ripple effect. With the money wasted on nukes with cost overruns, the grid in Ontario was neglected for many years. The big power outage showed how bad our grid is and how bad nukes are when something like this happens, as nukes just can't be turned on so easy and start generating power. After the big black out Ontario tried to negotiate with Quebec and Manitoba, but because of our poor grid, they were worried about ripple effects, they were turned down, forcing Ontario Hydro to face looking into upgrading the grid in Ontario.
Hydro electrical generation by water and turbine is simplistic, lower maintenance and requires fewer workers to maintain. There is no need for an army of workers to be on staff to be there for maintenance and what ifs. Is the brain trust of Ontario Hydro too smart for their own good? Because dams and turbines are too simple for their PhD and MBA brains, that they have to look for ways to produce power that are more elaborate and difficult to maintain so as to think they are fooling everyone that this is the only way for Ontario and really is their only way of staying employed at a cash cow.
Ontario has big rivers in its northern reaches which could be dammed and hydro electric generating stations built. Putting money and jobs in the north. Hopefully employing aboriginals and getting them off the dole. Taking all the little dams in Ontario that they moth balled after building the nukes and getting them up and running again. Stop wasting money and start saving Ontarians money.