I could be wrong, but I'm pretty sure because everything south of front st is man made that a "big dig" is virtually impossible. Or at least so cost prohibitive as to make it so.
As long as the waterfront is ruined anyway why not rebuild as a two level expressway. One way on either tier? Funny thought I know but perhaps doable.
You are correct and you are incorrect.
Toronto's shoreline way back when was naturally kind of marshy / what we would now call a wetland. The "Island" was never and Island, it was connected at both ends and formed a sort of giant pond.
The "Toronto Harbour Commissioners" were the most powerful men in the City of Toronto (The Toronto Harbour Commission) because they were engaged to reshape Toronto's waterfront. They dredged out the harbour and poured the soil from the bottom of the lake onto the marshy land to form the City as we know see it.
Example, the St. Lawrence Market. The north half of the building is built with conventional spread footings, however, the south half is built on piles because the land there is "man-made" and the first 10 or 20 feet is very soft and incapable of supporting the loads from the structure.
Union Station is all built on caissons. Caissons are essentially large concrete cylinders that are dug into the ground and used as foundations. You will often see modern buildings being built on caissons today. (You will see the foundation crew with a large drill rig with a huge drill bit on the end of it. They essentially drill holes into the ground and fill the holes with concrete). When they built Union Station, they would have what was called a caisson crew. In fact, they would have many caisson crews. They had a steel liner which they would use to line the excavation and guys would dig the caisson by hand with shovels and picks. They would line the excavation as they went down. (The legend is.....) At the end of the week, the Foreman would measure the depth of each caisson that had been dug (the progress). The crew that dug the least were all summarily fired. (The other story I heard was that if they crew didn't achieve the minimum, they were all fired.) I have no idea if this is true, however, it's an interesting story and I would not doubt it.
That said, the point of my story is that what they were trying to do was get the footings down to the hard native layer known as "the Toronto Shale". The Toronto Shale is not far down. Maybe 10 feet or so at Union Station. It's a weathered shale and has OK bearing capacity. Perhaps (conservatively, very conservatively) in the area of 10 tons per square foot. Keep digging and it becomes more sound and the bearing capacity increases. I can best describe shale as "hard mud". And it does not like to be exposed to either air, or especially water. Water turns shale into ooze very quickly.
My point is that it would be entirely possible to build a tunnel along the lakeshore, the tunnel would simply need to be built in the correct layer of soil. Idealy, you don't want mush, but you don't want rock either. For example, "the Chunnel" between England and France actually follows a chalk layer. The chalk is easy to mine, but not so soft that it's mush and requires hugely expensive soil stabilization.
I'm not 100 percent sure, but I think in the case of Boston, the soil there was quite soft and they had to employ a lot of slurry wall technology to build the damn thing and it was hugely expense to do so.